System for side slope soil and water conservation and soil stabilization layer slope protection and paving method
A slope and slope technology, applied in soil protection, excavation, construction, etc., can solve the problems of soil erosion, weak resistance to storm erosion, high maintenance costs in the later period, and hollowing and erosion of cells. The effect of solving soil erosion, preventing and controlling soil erosion, and resisting water erosion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A slope protection system for soil and water conservation and soil stabilization, the system includes a slope body, a flat-bottomed 3D soil-fixing mesh pad 1 is laid on the slope body, and ditches are arranged at the top and foot of the slope body Groove 2, the depth and width of the groove are both 400mm. Put the two ends of the flat-bottomed 3D soil-fixing mesh pad 1 into the groove 2 respectively, and then use steel nails 4 to fix the mesh pad and the soil layer. Two flat-bottomed 3D soil-fixing mesh pads are laid by overlapping, and the width of the overlap is 250mm. The distance between them is 1000mm, and the depth of the soil layer where the steel nails are anchored into the slope body is greater than 400mm. The flat-bottomed 3D soil-fixing mesh pad and the slope body are fixed by steel nails. Cover the soil with 30-50 mm, and then plant plants 3 on the flat-bottomed 3D soil-fixing mesh pad.
Embodiment 2
[0023] A laying method for a slope protection system for soil and water conservation and soil stabilization, comprising the following steps: 1. Slope cutting and cleaning of the slope surface, removing stones, plant roots and other rubbish with larger particle sizes on the slope surface. Depending on the actual soil conditions, backfill about 30mm of plowing soil and compact it to facilitate planting and growth. The foundation of the slope covered with a flat-bottomed 3D soil-fixing mesh pad must be stable; 2. Groove: at the top and foot of the slope, Each groove shall be opened with a depth and width of not less than 300mm; 3. Cutting and laying: measure the length of the slope and the depth of the grooves at both ends, calculate and cut the thickening of the corresponding length according to the slope (perpendicular to the shoreline direction) For flat-bottomed 3D soil-fixing mesh pads, move the mesh pads to the corresponding position and unfold along the soil slope and adjus...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com