Hydropower engineering immigrant management information system and method
A technology for managing information systems and hydropower projects, applied in the field of hydropower project resettlement management information systems, can solve the problems of opaque information, heavy modification workload, and low efficiency, and achieve a wide range of user audiences, improve work efficiency, and comprehensive business processes Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0078] like Figure 1~12 Among them, a hydropower project resettlement management information system, including a server and a terminal, the database of the hydropower project resettlement management information system is stored in the server, and the data of the server is operated through the terminal;
[0079] The hydropower project resettlement management information system includes: physical index management module, which is used to collect and query physical information related to resettlement;
[0080] Planning results management module, used for the management of planning reports, planning projects and budgetary estimates;
[0081] The plan management module is used for the management and query of plan suggestion, plan project library, annual plan and individual plan;
[0082] Resettlement implementation management, used for the whole-process resettlement management based on tenure households or tenure holders;
[0083] Progress management, used to manage the resettle...
Embodiment 2
[0118] On the basis of Embodiment 1, a method for resettlement management using the above-mentioned hydropower project resettlement management information system includes the following steps:
[0119]S1. Physical index data collection. The physical index data collected by institutions at all levels are aggregated and entered into the database after being publicized and confirmed by a third party; Binding to improve data reliability.
[0120] S2, such as Figure 18 Among them, agencies at all levels prepare project implementation plans, which are summarized and entered into the province’s approved implementation planning data after approval; through approval at all levels and reporting at each level, the accuracy and forward-looking of the planning plan can be ensured, and the smooth completion of the resettlement work can be ensured .
[0121] S3. Organizations at all levels formulate plans, which are entered into the province's annual plan and suggestion program after revie...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com