Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

60 results about "Management information systems" patented technology

A management information system (MIS) is an information system used for decision-making, and for the coordination, control, analysis, and visualization of information in an organization. The study of management information systems examines people, processes and technology in an organizational context.

Method and system for extracting ecological environment access list rule of intelligent agent

The invention relates to the technical field of environment management information systems, in particular to a method and a system for extracting an ecological environment access list rule of an intelligent agent. The method comprises the steps of collecting ecological environment policy and regulation data from a plurality of data sources, and performing data cleaning and labeling to obtain a standardized text data set; training and optimizing the data set to obtain an ecological environment professional knowledge large model; designing a prompt project template including input, instructions, examples and output requirements; inputting the cleaned new policy data into the large model, and automatically extracting a structured access list rule according to a prompt template; and finally outputting and storing the rule. According to the method, automatic conversion from an unstructured policy text to a structured access rule is realized, the problems of low efficiency, poor accuracy and difficulty in updating and maintenance of a traditional manual extraction mode are effectively solved, and the intelligent level and decision support capability of ecological environment partition management and control are remarkably improved.
Owner:THE THIRD GEOINFORMATION MAPPING INST OF MINISTRY OF NATURAL RESOURCES +1

Room ticket management information system construction method based on edge calculation

The invention relates to the technical field of room ticket information management, and discloses a room ticket management information system construction method based on edge computing, and the method comprises the steps: deploying an edge computing node to collect room ticket management original data in real time, including user qualification verification information, real estate resource information and the like; performing multi-dimensional policy matching degree optimization on the original data by adopting a genetic algorithm to generate a multi-dimensional feature matrix; constructing a room ticket transaction risk prediction model based on a capsule network, and outputting a risk level and a potential illegal behavior identifier; constructing a dynamic room ticket circulation graph according to the risk level and the identifier, and presenting a topological relation between related nodes and transaction paths; generating a transaction strategy matching rule including qualification verification conditions and the like based on the topological relation; and issuing the rule to an edge computing node to execute real-time transaction control. According to the method, the precision, dynamic and efficient room ticket management can be realized, and the standardization and controllability of room ticket transaction are improved.
Owner:FUZHOU XIANGSHENG SOFTWARE DEVELOPMENT CO LTD

Driver examination room inspection method and system

The invention relates to a driver examination room inspection method and system. The method comprises the following steps: before an examination, obtaining examinee examination information and record information of an examination room and an examination vehicle from a driver examination management system; based on the examination table and examination car random distribution rule, whether the number of the started examination table terminals and examination cars meets the examination starting requirement is inspected; inspecting the starting state and the running state of the examination room service equipment; performing safety inspection on the examination table terminal; performing business consistency and service state inspection on the examination car terminal; in the examination process, software and hardware environment change inspection is carried out on part of the in-examination examination table terminal and the in-examination examination vehicle terminal; after the examination is finished, various inspection results before examination, during examination and after examination are uploaded to a driver business management information system. The safety, the stability and the fairness of the examination system are remarkably improved through inspection in three stages, namely, before examination, during examination and after examination.
Owner:TRAFFIC MANAGEMENT RES INST OF THE MIN OF PUBLIC SECURITY

Method for making a see-through car model

The application discloses a Seethrough automobile model manufacturing method, and belongs to the technical field of automobile model design and manufacturing, and specifically relates to a Seethrough automobile model manufacturing method, which comprises the following steps: Step 1: data processing and structure design, skeleton processing, blank preparation, automobile body prototype and rapid forming part manufacturing are carried out through CAM and CNC technologies to meet the requirements of curved surface processing and precision, Step 2: blank preparation and skeleton manufacturing, skeleton processing, blank preparation, automobile body prototype and rapid forming part manufacturing are carried out through CAM and CNC technologies to meet the requirements of curved surface processing and precision, Step 3: interior and exterior trim rapid part manufacturing, Step 4: assembly adjustment, assembly adjustment is carried out in the assembly adjustment stage, detection and adjustment are carried out through CAQ technology, Step 5: surface treatment, Step 6: light effect programming and debugging, and Step 7: overall assembly, rapid manufacturing of a high-simulation and multi-functional comprehensive automobile model is realized, the CAD software and the CAM and CNC technologies are used, adaptive adjustment is carried out according to the change of data, and stable connection and integration with other management information systems are realized.
Owner:CHONGQING E-HAND MODEL TECH CO LTD

College institution service intelligent response system integrating self-service questions and answers and task work orders

PendingCN121961440ARelieve business pressureImprove digitizationSemantic analysisOffice automationQuestions and answersKnowledge graph
The invention relates to the cross technical field of a computer information technology and a college management information system, and provides a college institution service intelligent response system fusing self-service questions and answers and task work orders. The system comprises a user interaction module, a self-service question and answer engine, a work order generation and distribution module, a background processing and feedback module and a service statistics and optimization module. According to the invention, an advanced natural language processing technology, knowledge graph construction and intelligent work order management are fused, so that a college institution service intelligent response system integrating self-service question answering and task work orders is constructed. The system not only realizes seamless access and efficient intelligent interaction of multiple channels and multiple terminals, but also ensures that various problems are timely and accurately processed through automatic classification, responsibility distribution and closed-loop management.
Owner:NANJING INST OF MECHATRONIC TECH

Graphical user interface for a hygiene emergency resource provisioning integrated management information system for electronic devices

1. Name of the product in this design: Graphical User Interface for Integrated Management Information System for Health Emergency Resource Security in Electronic Equipment. 2. Intended use of this design: for use in electronic devices. 3. The key design features of this product are its graphical user interface. 4. The image or photograph that best illustrates the design's key features: the front view. 5. Purpose of the graphical user interface: Used for the operation and management of the comprehensive management information system for health emergency resource security on electronic devices. 6. Description of the changing states of the graphical user interface: The main view is the interface after logging in. Click "Material Application for this Department" in "Material Application for Material Application" on the left to get the interface change state diagram 1. Click "View" on the right side of interface change state diagram 1 to enter the details page of interface change state diagram 2. 7. Other situations requiring explanation: This product is designed as a graphical user interface (GUI), and the rear view, left view, right view, top view, bottom view, and 3D view are omitted. The expanded state diagram shows the state after the interface changes as shown in Figure 1.
Owner:JIANGSU PROVINCIAL CENTER FOR DISEASE CONTROL AND PREVENTION (PUBLIC HEALTH RESEARCH INSTITUTE OF JIANGSU PROVINCE)

Special industry public security management information system, device and method

The application provides a special industry public security management information system, device and method, relates to the technical field of public security management, and comprises the following steps: obtaining hotel safety facility data, determining the hotel business state as normal business and suspension of business according to the hotel safety facility data; analyzing the hotel safety facility data, hotel data and hotel security data and hotel report data in the past half year to generate a hotel attention coefficient, determining an attention hotel through the hotel attention coefficient, calling monitoring video and registration data of the key attention hotel in the past one month, and analyzing and generating an abnormal accommodation coefficient; generating a public security force distribution coefficient according to the registration implementation degree and the abnormal accommodation coefficient, and completing the distribution of the public security force of each key attention hotel according to the public security force distribution coefficient.
Owner:NANTONG SHENDUN INFORMATION TECHNOLOGY CO LTD

Hospital DRG and DIP management information system based on artificial intelligence

The invention relates to the technical field of medical informatization, and discloses a hospital DRG and DIP management information system based on artificial intelligence, which comprises an intelligent grouping module, a payment rate calculation module, a performance evaluation module and a data security module. The intelligent grouping module analyzes medical records, medication and inspection data by using a DeepSeek algorithm, automatically completes DRG / DIP grouping and generates a medical record combination report; the payment rate calculation module predicts the proportion of cost composition and payment through machine learning based on historical cost and settlement information, and automatically generates a payment standard capable of being dynamically adjusted; the performance evaluation module evaluates the efficiency and quality of departments or disease categories in a multi-dimensional manner, and provides a visual report to assist resource configuration optimization; the data security module guarantees the security of diagnosis and treatment data by adopting an encryption technology and authority management. The system is designed in a modularized mode, and data can be extracted from the HIS and the LIS and integrated to a unified platform. The method has the advantage that intelligent analysis and management of diagnosis and treatment data are realized by using a deep learning algorithm.
Owner:YUFANG ZHISHU MEDICAL (SHENZHEN) CO LTD

Significant and critical infectious disease management information system graphical user interface for electronic devices

1. The name of the present design product: graphic user interface of major and key infectious disease management information system for electronic equipment. 2. The use of the present design product: for electronic equipment. 3. The design points of the present design product: in the content of the graphic user interface. 4. The picture or photo that best indicates the design points: front view. 5. The present design is a planar graphic user interface, and the rear view, left view, right view, top view, bottom view and perspective view are omitted. 6. The use of the graphic user interface: for operation and management of major and key infectious disease management information system on electronic equipment. 7. The change state description of the graphic user interface: the front view is the interface after login, and the interface change state figure 1 is obtained by clicking "view report card information" on the right side.
Owner:JIANGSU PROVINCIAL CENTER FOR DISEASE CONTROL AND PREVENTION (PUBLIC HEALTH RESEARCH INSTITUTE OF JIANGSU PROVINCE)

Full-field information management system based on photo-thermal field station

The invention relates to a full-field information management system based on a photo-thermal field station. The whole-plant information management system based on the photo-thermal field station comprises a whole-plant computer network system which is used for communicating and interconnecting a whole-plant management information system and a whole-plant information monitoring system; the whole-plant information monitoring system is used for collecting operation parameters of photo-thermal power station equipment in real time, analyzing and processing the operation parameters and generating a fault work order; and the whole plant management information system is used for carrying out statistical analysis on the fault work order and generating a preventive maintenance plan. According to the embodiment of the invention, the problem that the photo-thermal power station is difficult to operate and maintain can be solved.
Owner:CHINA THREE GORGES RENEWABLES (GRP) CO LTD +1

An amusement park safety management information system and method

This disclosure relates to the field of amusement park safety management, specifically to an amusement park safety management information system and method. The system includes: a data perception layer comprising multiple sensing terminals distributed throughout various areas of the amusement park; a network transmission layer, communicatively connected to the data perception layer, used to receive and transmit various types of data collected by the data perception layer; a data processing layer, communicatively connected to the network transmission layer, including a data preprocessing module, a risk assessment module, and a data storage module; an application service layer, communicatively connected to the data processing layer, including a personnel management module, an equipment maintenance module, an emergency response module, and an early warning release module; and a terminal layer, including management terminals, staff terminals, and visitor terminals, communicatively connected to the application service layer, used to receive information from the application service layer and upload interactive data to the application service layer.
Owner:SHANXI XINYIYUAN AMUSEMENT PARK SERVICE CO LTD

Community multi-source management information system and method based on access control machine

The invention provides a community multi-source management information system and method based on an access control machine, and the system combines an Internet of Things fire-fighting sensing system, an access control terminal, a central control server, a property management and control background and an owner APP, and the Internet of Things senses community multi-source fire data and carries out the real-time fire early warning. The system can perceive fire conditions in real time and quickly perceive the fire conditions based on standardized fire emergency plan information support provided by a public security / fire-fighting platform, and the system gives emergency plans of corresponding levels and distributes the emergency plans to an access control machine cluster and a property management and control background. Emergency instructions are quickly responded through the access control system, emergency measures are displayed through a screen of the access control machine, real-time fire-fighting evacuation is guided for property management / owners, emergency response is quickly carried out, and the property management efficiency is improved. Once the fire behavior is sensed, the system associates and pushes the fire behavior condition and the emergency plan, compared with manual notification, the system is faster and more efficient, fire behavior emergency evacuation is prevented from being delayed by some owners due to reasons, and the safety service level of property management for the owners is improved.
Owner:MIDA CLOUD COMPUTING (HANGZHOU) CO LTD

Antibacterial substance management information system based on artificial intelligence

The invention discloses an antibacterial substance management information system based on artificial intelligence, and relates to the field of medical information, a plurality of historical antibacterial grade sequences sorted according to time are acquired from historical antibacterial treatment data, and a gradient sequence based on adjacent time step difference values is generated; the system calculates the continuous gradient length based on the sliding window, wherein the continuous gradient length reflects the continuous upgrading or degrading trend of the antibacterial grade; in a self-attention layer of the Transform network, a time step with a larger continuous gradient length is endowed with a higher attention weight, so that a key change fragment in the antibacterial grade sequence is highlighted, and the Transform network is trained based on a historical antibacterial grade sequence to obtain an antibacterial grade prediction model. According to the invention, intelligent prediction and management optimization of the antibacterial drug grade in the future can be realized by using the antibacterial grade change characteristics.
Owner:MINNAN NORMAL UNIV

Regional medical treatment and health integrated management information system based on cloud platform

The invention discloses a regional medical treatment and health integrated management information system based on a cloud platform, and relates to the technical field of information systems, the system is based on the cloud platform technology, various medical treatment and related mechanisms are seamlessly integrated on a comprehensive platform, and an information barrier brought by a traditional independent system is eliminated. Specifically, all information is uploaded to the cloud server in a unified manner and interacts with the cloud server, so that the defects of physical isolation and information dispersion caused by respective establishment of systems are overcome. And meanwhile, standardization of data formats is ensured by a unified system architecture, so that data isolation caused by inconsistent data formats is broken. In addition, the uniformity of information flow and the convenience of management are ensured by the integrated architecture, and the expansion, upgrading and maintenance of the system are facilitated by the interface type decoupling design. The system also provides a visual interactive portal which is visual and easy to use, and ensures that medical workers, patients, system management personnel and maintenance personnel can quickly adapt and effectively use the system.
Owner:GUANGDONG SHUNDE SHUNYI HEALTH INFORMATION TECHNOLOGY CO LTD

An integrated project management information system and method

PendingCN122114839AOffice automationCommerceGraph structured dataProject management information systems
The application relates to the technical field of management and decision support information system, and discloses a comprehensive plan management information system and method, which comprises the following steps: acquiring time sequence dependent graph structure data of each project and plan time period and resource demand identification of each bidding task, generating a cross-project resource association graph as a resource layer of a double-layer graph atlas; receiving resource scheduling change event data, calculating time offset of each affected task, and generating a resource layer affected task set; mapping an indirect risk value of a supplier layer to an associated bidding task, superimposing the time offset influence of the resource layer, and identifying a high-risk bidding task with a composite risk index exceeding a threshold value. The application solves the technical problems that resource conflict analysis and supplier risk analysis are independently operated, cross-system interaction is ignored, and composite risk cannot be timely warned.
Owner:CHANGCHUN LINGHANG TECH CO LTD

Efficient vertical machining center BOM building method

The invention discloses an efficient vertical machining center BOM building method, and belongs to the technical field of machine manufacturing. The method comprises the following steps that S1, a BOM frame is built based on the modular design concept; s2, carrying out association design by utilizing three-dimensional design software; s3, establishing a BOM change management mechanism; and S4, introducing a related research and development product management informatization system. According to the method, the building efficiency is improved, a large amount of manual input work is avoided, and the BOM building time is greatly shortened; the accuracy is improved, human errors are reduced, and the accuracy and integrity of BOM information are ensured; the method adapts to design changes, can quickly respond to the design changes, timely updates BOM information, and effectively reduces production risks and cost increase caused by the design changes. Data management is facilitated, efficient management and utilization of BOM information are achieved, and data query and analysis of links such as production plan making, purchase management and cost control are facilitated.
Owner:安徽卓朴智能装备股份有限公司

Property information management method and system based on artificial intelligence

The invention provides a property information management method and system based on artificial intelligence, and belongs to the technical field of data management, and the method specifically comprises the steps: obtaining the composition data of a to-be-replaced lockset in a management region, so as to obtain the composition data and the similar use conditions of an intelligent lockset in each management region, the method comprises the steps of determining a management area for lock replacement processing in a management area, determining a replacement processing target of a lock in the management area for lock replacement processing according to the use condition of the intelligent lock in the management area for lock replacement processing in other management areas, and performing lock replacement processing based on the lock replacement target. And the management area accessed to the property management information system in the management area is determined by using the replacement processing result of the lock, so that the reliability degree of monitoring processing of the intelligent lock is improved.
Owner:NAT CERTIFICATION TECH (HANGZHOU) CO LTD

Hospital comprehensive operation management method and system

The invention provides a hospital operation management digital intelligence construction solution, and aims to comprehensively improve the scientization, standardization, refinement and intelligence level of hospital operation management by constructing an integrated operation management information system. The scheme covers multiple fields of manpower, finance and economics, materials, projects, teaching, scientific research, decision making and the like, and comprehensive upgrading of hospital operation management is realized through data integration, business process optimization, intelligent analysis and comprehensive performance management. According to the scheme, advanced technologies such as big data and artificial intelligence are utilized, a data island is broken, information sharing and cooperative work among departments are realized, and the operation efficiency is improved. Meanwhile, the scheme pays attention to mobile and convenient design, and hospital managers and employees are supported to access and process businesses anytime and anywhere. According to the invention, many problems existing in traditional hospital operation management can be effectively solved, the overall competitiveness of the hospital is improved, and powerful support is provided for high-quality development of the hospital.
Owner:THE FIRST AFFILIATED HOSPITAL OF ARMY MEDICAL UNIV

Work trace graphical user interface for electronic equipment

1. Name of the design product: Working track graphical user interface for electronic equipment. 2. Purpose of this design product: This design product is used to run and display programs. 3. The design highlights of this appearance design product are the user interaction interface and display graphics in the screen panel. 4. The picture or photo that best illustrates the key points of the design: main view. 5. For conventional design, the rear view, left view, right view, top view and bottom view are omitted. 6. Purpose of the graphical user interface: The graphical user interface of this design product is used as the human-computer interaction interface of Shanghai's urban grid management information system; the main view is the main interface of urban grid management; after human-computer interaction with the main view (click the "Emergency Duty" icon in the upper right corner of the right half of the main view), the interface change status diagram 1 is displayed; after human-computer interaction with the interface change status diagram 1 (click the "Event Type Year-on-Year and Month-on-Month Statistics" icon in the pop-up tab bar), the interface change status diagram 2 is displayed. 7. Other situations that need explanation: The enlarged view of the left part of the main view and the enlarged view of the right part of the main view are combined to form an enlarged view of the main view; the enlarged view of the left part of the interface change state 1 and the enlarged view of the right part of the interface change state 1 are combined to form an enlarged view of the interface change state diagram 1; the enlarged view of the left part of the interface change state 2 and the enlarged view of the right part of the interface change state 2 are combined to form an enlarged view of the interface change state diagram 2.
Owner:SHANGHAI URBAN & RURAL CONSTR & TRANSPORTATION DEV RES INST (SHANGHAI DIGITAL CITY MANAGEMENT CENT)

Plastic blood bag

The utility model relates to the field of medical instruments, in particular to a plastic blood bag. The blood bag comprises various models and is characterized in that heat seal sites are marked on the blood collection tube and the transfer tube, and identifiable marks are attached to the bag body. Heat sealing is carried out according to heat sealing sites, the blood collection tube and the transfer tube can be subjected to heat sealing to form the standard length, and it is guaranteed that the blood volume in a heat sealing section meets the blood sample preservation and later-stage cross blood matching requirements; the identification attached to the bag body is automatically identified, so that the blood bag information can be directly input into a blood management information system, and the risk that the blood bag information is input mistakenly is avoided.
Owner:CHENGDU BLOOD CENT

Time sequence task reminding system, rail vehicle and task reminding method

The invention provides a time sequence task reminding system, a railway vehicle and a task reminding method, and relates to the technical field of intelligent operation and maintenance of railway vehicles. The system comprises a time sequence task generation module and a time sequence task reminding module which are in communication connection. Wherein the time sequence task generation module is used for configuring a target operation and maintenance reminding task of the railway vehicle; receiving operation data of a first moment transmitted by a bus of the railway vehicle; generating a task reminding instruction based on the target operation and maintenance reminding task and the operation data at the first moment; sending the task reminding instruction to a time sequence task reminding module; the time sequence task reminding module is used for receiving a task reminding instruction; and based on the task reminding instruction, popping up task reminding information on an information display interface of the locomotive management information system. The time sequence task reminding system can replace a traditional operation and maintenance mode of manual memory and paper ledger, effectively avoids the risks of missing detection and error detection, and improves the automation and intelligence level of the operation and maintenance work of the railway vehicle.
Owner:CRRC CHANGCHUN RAILWAY VEHICLES CO LTD

Intelligent public security comprehensive management information system and reporting method

The application provides a smart public security comprehensive management information system and a reporting method, relates to the technical field of smart public security, and is a smart public security comprehensive management information system, which comprises a monitoring and collecting module, a two-dimensional coordinate system is arranged on a monitoring road surface image, and monitoring road surface image data is collected; the application sets up monitoring on the monitoring road surface, collects image data, analyzes and calculates the right turn of a vehicle, analyzes the right turn path of the vehicle by setting the coordinate system, and compares with the pedestrian coordinates; when the pedestrian coordinates are on the upper side of the right turn path of the vehicle, the voice broadcast device is used to remind the pedestrian to avoid, which can greatly reduce the probability of traffic security accidents, specifically, the conversion speed, acceleration and turning angle of the vehicle are analyzed, the vehicle offset point is generated, the vehicle control point is generated, the actual situation is more fitted, the output is more accurate, the Bezier curve is used to analyze the right turn trajectory of the vehicle, and finally, the trajectory related formula is output.
Owner:NANTONG SHENDUN INFORMATION TECHNOLOGY CO LTD

Railway train operation efficiency management analysis method integrating multiple systems

PendingCN120579911ARegistering/indicating working of vehiclesRailway traffic control systemsUniform systemTechnical management
The invention discloses a railway train operation efficiency management and analysis method integrating multiple systems, which comprises the following steps of: respectively accessing a safety management information system, a railway wagon technical management information system, a locomotive dispatching system, a railway transportation unification system and a train operation monitoring and recording system, and distinguishing according to train head behaviors by taking a train head as a benchmark; the method comprises the following steps: respectively establishing a final arrival train operation model, a starting train operation model and a rapid turn-back train operation model of a train, acquiring various data of a train head in the actual operation process of the train, and performing comparative analysis according to the data recorded by a train operation monitoring and recording system and the models; a plurality of systems are accessed, and the information of the train running state and the recorded running model and standard information are compared and analyzed, so that the monitoring of the train running state and the matching state among departments can be quickly and accurately realized.
Owner:INFORMATION TECH INST OF CHINA RAILWAY ZHENGZHOU BUREAU GRP CO LTD

Intelligent operation and maintenance management platform for waste incineration power plant, information management method and equipment

The application relates to the garbage incineration technical field and discloses a garbage incineration power plant intelligent operation management and control platform, an information management method and equipment; a management information system of the platform comprises a data acquisition module, which is used for acquiring to-be-processed production data from a distributed control system, the to-be-processed production data comprising at least one of industrial garbage entering quantity, household garbage entering quantity, urea consumption quantity, activated carbon consumption quantity, calcium hydroxide consumption quantity, power generation quantity, fly ash quantity and slag quantity; a data processing module is used for statistically processing and / or comparing the to-be-processed production data, obtaining a processing result and returning the processing result to a front-end interface. The platform of the embodiment of the application comprises a new management information system, the to-be-processed production data can be secondarily processed, and the to-be-processed production data is displayed to a management personnel in the form of intuitive and high readability charts through the front-end interface, so that the management personnel can quickly master the production efficiency and operation condition of the power plant and make correct decisions according to the charts.
Owner:CHINA NAT ENVIRONMENTAL PROTECTION CORP

Nursing care information system

A nursing care information system including mobile devices and hospital information computer devices; the mobile device includes: a user interface module electrically connected to the mobile device, for inputting user information; and six modules electrically connected to the user interface module, including a patient list module, for providing a list of patients cared for by nursing staff; a medical order confirmation module, for pushing and sound notifications, reminders and confirmations to nursing staff; a mobile drug delivery module to providing medical advice to patients under the care of nursing staff; an nursing record module to provide nursing staff with input of patient event records; a work list module to provide and remind nursing staff of to-do items; the upload photo module is used to provide nursing staff with the ability to take photos of patient wounds and image records of special events.
Owner:BUDDHIST TZU CHI GEN HOSPITAL

System for Object Inference and Image Capture Device

The wildlife management information system collects, stores, analyzes, and manages image data captured and collected from various image and data sources for objects of interest within a scene of interest. The information system uses various conventional computer hardware to host a cloud-based information structure along with artificial intelligence modeling to generate enhanced images and object inference data from captured digital images and depth data for objects of interest within scenes of interest. The system includes a specialized image captured device that captures or generates both object images and depth data for an object of interest within a scene of interest. The AI modeling allows for improved accuracy and enhanced object inference data.
Owner:VALE INC

A small food testing laboratory data management information system, method, apparatus and storage medium

This invention discloses a data management information system for a small food testing laboratory, including a sample information management module, an automated task allocation module, a data storage module, a permission management module, and a human-computer interaction module. The sample information management module is used to input, edit, query, and maintain the entire lifecycle information of test samples in the small food testing laboratory. The automated task allocation module automatically allocates testing tasks to corresponding testing personnel and instruments based on the input sample testing items and the workload of the testing personnel. The data storage module stores sample monitoring information, and the permission management module assigns different data operation permissions and task management permissions according to user roles. The advantages of this invention compared to existing technologies are: it provides a convenient and intelligent task allocation system, method, device, and storage medium for data management in a small food testing laboratory, facilitating data query and management.
Owner:TAIZHOU XINGKA INSPECTION TECHNOLOGY CO LTD

Operation resource state monitoring management method and system

The invention provides an operation resource state monitoring management method and system, and belongs to the technical field of state monitoring, and the method specifically comprises the steps: determining an optimization management information system in a problem information system based on the matching condition of historical problem processing data of a matching deviation problem type, according to real-time monitoring results of problem types of different reliable information systems and in combination with matching deviation problem types in different optimization management information systems, the management method for operation resources of large models of different optimization management information systems is determined, the efficiency and reliability of problem processing by using the large models are improved, and the problem processing efficiency is improved. And meanwhile, the abnormal occupation risk of multiple times of question and answer processing on computing power resources is also reduced.
Owner:STATE GRID HENAN INFORMATION & TELECOMM CO +1

A new power system meteorological disaster prevention auxiliary decision method

The application discloses a novel power system meteorological disaster defense auxiliary decision method, obtains a current whole network main equipment defect hidden danger set according to the geographical coverage range of meteorological disaster forecast and early warning information; screens a main equipment set located in a warning area, and obtains corresponding equipment reliability indexes in a production management information system; performs reliability secondary evaluation on a main equipment set associated with a current meteorological warning; generates an equipment operation and maintenance attention degree sorting table and a corresponding equipment side operation and maintenance decision according to the equipment reliability indexes and the reliability secondary evaluation results; reconstructs a fault set sorting table according to the power grid operation attention degree and the correlation between the equipment, and according to the 'N-X' principle; screens a fault set according to the most serious condition, and performs power system steady state analysis calculation for the whole network range; generates a whole network system control strategy suggestion for the current meteorological warning according to the calculation results, and forms a complete power grid operation decision in combination with the equipment side operation and maintenance decision.
Owner:STATE GRID LIAONING ELECTRIC POWER CO LTD +1

Method and device for constructing fund safety guarantee system of immigrant management information system, and medium

PendingCN121458208AFinanceOffice automationLand acquisitionSource Data Verification
The invention discloses an immigrant management information system fund safety guarantee system construction method and device and a medium, and relates to the technical field of immigrant fund safety management.The method comprises the specific steps that a distributed data chassis is constructed to store immigrant project data, a data verification method is adopted to conduct credible data verification on the immigrant project data, and a data verification result is obtained; an identity authentication and access control model is established for identity authentication, an intelligent fund contract is established, the intelligent fund contract is executed after the identity authentication is passed, the fund flow generated in the process of executing the intelligent fund contract is monitored in real time, abnormity is identified, and risk early warning is triggered. The layered architecture and the refined authority design can adapt to the requirements of water conservancy project immigrant projects of different scales, provide technical support for transparency, standardization and high efficiency of immigrant management work, and are suitable for various water conservancy project land acquisition immigrant fund safety guarantee scenes.
Owner:CHINA THREE GORGES CORPORATION +1