A nuclear power project economic evaluation method based on full-life leveling and declaration

An evaluation method and project economic technology, applied in the field of economic evaluation of nuclear power projects based on life-cycle discounting, can solve problems such as difficult reference or accurate application, insufficient understanding or even deviation, and restrictions on export work, so as to reduce errors Possibility of decision-making, effect of avoiding waste of resources

Pending Publication Date: 2019-05-28
CHINA NUCLEAR POWER ENG CO LTD
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the inventor found through research that taxation and other policies have been considered in the calculation of the levelized cost of power generation in the photovoltaic industry, and at the same time the method has been greatly changed, partly out of the true meaning of the levelized discounted cost of power generation
[0005] At the same time, due to the simplification and deformation of the calculation method of the levelized discounted power generation cost of international organizations, the relevant domestic units have insufficient understanding or even deviation of the method, and it is difficult to learn from it or apply it accurately.
In the process of promoting the nuclear power industry to go global, there is no economic evaluation method that can be referred to, which can not only meet the relevant regulations of domestic energy standards, but also realize the convenience and speed of the calculation process, and at the same time be in line with the economic evaluation methods commonly used by international organizations. The phenomenon has greatly restricted the development of China's export work

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A nuclear power project economic evaluation method based on full-life leveling and declaration
  • A nuclear power project economic evaluation method based on full-life leveling and declaration
  • A nuclear power project economic evaluation method based on full-life leveling and declaration

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] In order to enable those skilled in the art to better understand the technical solutions of the present invention, the present invention will be described in further detail below in conjunction with the accompanying drawings and examples.

[0052] The economic evaluation of nuclear power export projects is to evaluate the economics of the entire nuclear power plant from the perspective of investors. Therefore, the economic evaluation of export projects not only needs to consider the work and costs of the EPC (Engineering Procurement Construction, general contracting) implementation unit, but also the work and costs incurred by the investor himself or entrusted to other units or departments. At the same time, the investors should consider the benefits they get when they operate power plants in various forms.

[0053] There are two ways to measure project economics: one is to compare the unit kilowatt cost during the project construction period; the other is to carry out ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a nuclear power project economic evaluation method based on full-life level declaration. The nuclear power project economic evaluation method comprises the following steps: 1) determining basic attributes of a nuclear power station, a unit construction investment condition and a nuclear power project basic operation condition; 2) calculating the quasi investment cost LCOA, the quasi fuel cost LCOF and the quasi operation and maintenance cost LCOO according to the parameters determined in the step 1); 3) calculating the level-to-level deduction power generation cost LCOE,wherein the LCOE = LCOA + LCOF + LCOO; 4) carrying out sensitivity analysis and risk analysis; and 5) comparing according to the calculated level-to-level implicit power generation cost LCOE by referring to a compared target, and combining a sensitivity analysis result and a risk analysis result to obtain an evaluation conclusion. According to the method, on the basis of reproduction of the powergeneration cost and the grid-connected electric quantity of the nuclear power unit in the whole life period, the important indexes representing the economical efficiency are calculated, namely, the generation cost is reproduced in a leveling mode, the relevant stipulations of domestic energy targets can be met, the calculation process can be convenient and fast, and meanwhile the method is in line with the conventional economic evaluation method of international organizations.

Description

technical field [0001] The invention relates to the technical field of economic evaluation of nuclear power projects, in particular to an economic evaluation method for nuclear power projects based on life-cycle levelization discounting. Background technique [0002] For my country's nuclear power projects, a consistent and definite economic evaluation method has been formed in the industry. The National Energy Administration has issued the standard "Economic Evaluation Method for Nuclear Power Plant Construction Projects" (NB / 20048-2011). This standard inherits the "Construction Project Economic Evaluation Method and Parameters". The specific evaluation method is: based on the construction investment of nuclear power projects, predicting reasonable operating conditions, calculating operation and maintenance and fuel costs based on contract conditions and historical experience, and ensuring cost recovery, Under the premise of fulfilling the loan repayment contract, legal ta...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCY04S10/50
Inventor 郑保军薄美芳韩兆兴张弘胡江李智勇
Owner CHINA NUCLEAR POWER ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products