Continuous steel truss bridge side span rapid closure construction system and construction method
A technology for steel truss bridges and side spans, which is applied in the field of rapid closure construction system for side spans of continuous steel truss bridges, and can solve problems such as long construction period, high cost measures, safety risks and potential safety hazards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The following will be combined with Figure 1-Figure 9 The present invention is described in detail, and the technical solutions in the embodiments of the present invention are clearly and completely described. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0018] The present invention provides a continuous steel truss girder bridge side span fast closing construction system through improvement, which can be implemented in the following manner; System 4; wherein, the temporary support pad 3 is composed of a sand bucket 5, a steel pillow 6 and a PTFE slide plate 7, and the temporary support pad 3 is located on the temporary support 2 as a whole; wherein, a reaction force frame is installed on the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com