Power equipment power failure plan making method based on Hadoop platform
Patent Information
- Authority / Receiving Office
- CN Β· China
- Current Assignee / Owner
- GUANGDONG POWER GRID CO LTD
- Publication Date
- 2019-12-03
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of power system equipment outage plan preparation, and more specifically, relates to a Hadoop platform-based power outage plan preparation method for power equipment. Background technique
[0002] The proposal and development of smart grid put forward higher requirements for the economical and efficient operation of the grid. Correspondingly, how to formulate an optimal power outage plan, reduce the number of equipment outages and outage time while meeting the planned maintenance and transformation of equipment, and maintain the stable operation of the power system has always been a key issue in the research and attention of power grid operation and maintenance units. Under the current mode, the main method of compiling the power system outage plan is: collect the outage demands of all parties layer by layer, including equipment planned maintenance, renovation and replacement projects, etc., and then rely on managemen...