A grout-stopping device and a grouting anchor cable hole-sealing and grout-stopping method
A technology of grouting anchor cables and plugging devices, which is applied in the installation of anchor rods, sealing/packing, earthwork drilling and mining, etc. It can solve the problems of poor grouting effect, poor reinforcement and support effect, and grout leakage, etc., to achieve Increased strength, more reliable plugging effect, and improved support strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] A specific embodiment of the present invention, such as figure 1 As shown, a kind of anti-slurry plugging device is disclosed, comprising foaming agent nozzle 5 and foaming agent injection pipe 7, one end of foaming agent injection pipe 7 is connected to foaming agent nozzle 5, and the other end is connected to foaming agent storage tank 8 connections; foaming agent nozzle 5 and foaming agent injection pipe 7 can be sleeved on the grouting anchor cable 4, and can move in the borehole along the grouting anchor cable 4; The solidified foam formed by the foaming agent can contact the hole wall to complete the grout blocking. Preferably, the foaming agent nozzle 5 and the foaming agent injection pipe 7 are both inner and outer double-tube structures coaxially arranged. diameter, the annular space of the double tube structure is used for the blowing agent to flow. The junction of blowing agent storage tank 8 and blowing agent injection pipe 7 is provided with switch, the i...
Embodiment 2
[0046] Yet another specific embodiment of the present invention discloses a method for sealing holes and preventing grouting of grouting anchor cables. The method for sealing holes and preventing grouting using the device for preventing grouting in Embodiment 1 specifically includes the following steps:
[0047] Step 1: Determine the sealing position according to the roadway surrounding rock conditions.
[0048] Construction of grouting and anchor cable drilling, observation and analysis of the surrounding rock loosening circle of the roadway through the drilling peeping instrument, the height of the broken surrounding rock 6 area in the shallow part of the surrounding rock is obtained, and then the layout height of the grout blocking structure 11 is determined, and the polyurethane foam The height of the grouting plugging structure formed by filling the annular gap between the grouting anchor cable 4 and the borehole wall, as Figure 5 shown.
[0049] Step 2: install the gro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com