Water and Soil Conservation and Ecological Afforestation Methods of Mine Dump
A technology for dumps and mines, applied in the field of soil and water conservation and ecological restoration, can solve problems such as soil erosion, water retention, poor water retention capacity, corrosion resistance, and anti-scour capacity, and achieve the effect of preventing soil erosion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0091] The invention provides a method for water and soil conservation and ecological greening of a mine dump, comprising the following steps:
[0092] Step 1. Repair the mine dump, trim the top of the mine dump to a platform area with a slope of 13 degrees or less, and trim the slope of the mine dump to a slope of 45 degrees or less;
[0093] Step 2. Deep plow and dry the platform area twice, the depth of deep plowing each time is 40cm, and the drying time is 5 days each time;
[0094] Step 3: Plow the platform area twice, the depth of each plowing is 20cm, and mix the fermented and decomposed soil with grass seeds into the soil at the same time for the first plowing, and the surface of the platform area per square meter is averagely mixed with Fermented decomposed soil 0.05m 3 , the second plowing and burying the biomass strip bag into the soil at the same time; the fermented and decomposed soil contains 40% fermented and decomposed fertilizer, and the biomass strip bag is ...
Embodiment 2
[0111] The invention provides a method for water and soil conservation and ecological greening of a mine dump, comprising the following steps:
[0112] Step 1. Repair the mine dump, trim the top of the mine dump to a platform area with a slope of 13 degrees or less, and trim the slope of the mine dump to a slope of 45 degrees or less;
[0113] Step 2, deep plowing and drying the platform area twice, the depth of each deep plowing is 50cm, and the drying time is 10 days each time;
[0114] Step 3: Plow the platform area twice, the depth of each plowing is 30cm, and mix the fermented and decomposed soil with grass seeds into the soil at the same time for the first plowing, and the surface of the platform area per square meter is averagely mixed with Fermented decomposed soil 0.05m 3 , the second plowing and burying the biomass strip bag into the soil at the same time; the fermented and decomposed soil contains 20% fermented and decomposed fertilizer, and the biomass strip bag i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com