Construction method for underneath passing of road section with heavy traffic pressure
A construction method and pressure technology, applied in the direction of roads, roads, tunnels, etc., can solve problems affecting traffic, etc., and achieve the effects of shortening the construction period, reducing impact, and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0023]The embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and detailed implementation modes and specific operation procedures are given, but the protection scope of the present invention is not limited to the following的实施例。 Example.
[0024]The technical scheme of the present invention is: a construction method for underpassing a road on a heavy traffic pressure section, including the following steps:
[0025]S1. Set up pile-type ground anchors as pile foundation;
[0026]S2. Fix prestressed concrete portals at both ends of the subgrade, drill holes in the subgrade side by side at equal intervals along the direction of the portals to generate reserved grouting holes 11, both the subgrade and the portals are set on pile anchors, the portals The bottom is connected with pile type ground anchors;
[0027]S3. Set up steel pipes insid...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap