Interactive game scheduling method for park integrated energy system group and power grid

A technology of integrated energy system and dispatching method, which is applied in the field of interactive game dispatching between the integrated energy system group of the park and the power grid, can solve the problems of not considering the distribution of interests between the power grid and the park, incomplete stakeholders, and less consideration in optimal dispatching, etc. Achieve the effect of facilitating commercial development, good commercial development prospects, and easy control

Pending Publication Date: 2021-04-02
STATE GRID LIAONING ECONOMIC TECHN INST +3
View PDF0 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Some experts have established an optimal dispatching model for multi-park integrated energy systems that considers power interaction and coordinated output between different parks, taking into account the power interaction between parks and between parks and distribution networks, but the above research will Roughly, the interactive power between the park and the distribution network is included in the minimum operating cost objective function, which is a unified scheduling method, and the collaborative interaction between the power grid and MCIES is not obvious
[0005] At present, there are three issues to be further explored: ①The optimal scheduling of MCIES seldom considers the influence of multi-energy collaborative interaction between parks on the optimal operation of multi-parks and the impact of distribution network on MCIES; ②Modeling multi-parks and power grids as different stakeholders , but when solving, the active distribution network economy is optimal first, and then the "secondary coordination" of the multi-park integrated energy system is optimal, and parallel solutions for multi-microgrids and power grids cannot be achieved
③The stakeholders considered in MCIES multi-agent decentralized coordination scheduling are not comprehensive, and the distribution of benefits between the power grid and the park is not considered

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Interactive game scheduling method for park integrated energy system group and power grid
  • Interactive game scheduling method for park integrated energy system group and power grid
  • Interactive game scheduling method for park integrated energy system group and power grid

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings and simulation experiments.

[0056] Such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 Shown, the present invention comprises the following steps:

[0057] Step 1) Establish output models and cost models of conventional generator sets, distributed power sources, energy storage and other equipment;

[0058] Step 2) Establish a collaborative optimization control framework for the integrated energy system group in the park and the power grid;

[0059] (1) Establish a hierarchical decomposition optimization model to realize the coordinated control of the power grid and the park's comprehensive energy system group: the upper layer is the regional coordinated control of the power grid and the park operator, and the lower layer is the local coordinated control of the park's comprehensive energy system group;

[0060] (2) Th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

An interactive game scheduling method for a park integrated energy system group and a power grid belongs to the technical field of integrated energy system operation and control, and is characterizedby comprising the following steps: (1) establishing output models and cost models of a conventional generator set, a distributed power supply, energy storage and other equipment; 2, establishing a park comprehensive energy system group and power grid collaborative optimization control framework; 3, establishing a power grid and park integrated energy system group game structure; (4) setting a threshold value, and judging whether an interactive game is performed or not; 5, establishing a park comprehensive energy system group and power grid interactive game model based on master-slave game; (6)establishing an interactive game scheduling Matlab platform of the park comprehensive energy system group and the power grid to solve an interactive process; and (7) performing simulation analysis onthe effectiveness of the interactive game scheduling strategy of the hierarchically coordinated park comprehensive energy system group and the power grid, and verifying that the interactive game scheduling strategy of the hierarchically coordinated park comprehensive energy system group and the power grid can realize stable and economic operation of the park comprehensive energy system group andthe power grid. According to the interactive game scheduling method adopted by the invention, cooperative optimization operation of the park comprehensive energy system group and the power grid can beeffectively and reliably carried out, and a technical basis and a practical method are provided for stable operation of the park comprehensive energy system group and the power grid.

Description

technical field [0001] The present invention relates to an interactive game dispatching method for park comprehensive energy system groups and power grids, in particular to an interactive game scheduling method for park comprehensive energy system groups and power grids based on layered collaborative control and master-slave game, which belongs to the operation of comprehensive energy systems and control technology. Background technique [0002] The large-scale grid-connection of distributed power sources makes the original radial network of single-end power supply evolve into a complex network of multi-terminal power supply. The complexity of relay protection is greatly increased; at the same time, the output of renewable distributed power has strong randomness and volatility, which will damage the power balance of the power grid, thus affecting the voltage and frequency stability in the system. At present, the integrated energy system group is an effective way to solve th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06F30/20G06Q50/06
CPCG06Q10/06312G06Q10/06315G06Q50/06G06F30/20Y02E40/70Y04S10/50
Inventor 张明理张娜宋坤潘霄韩震焘程孟增许超宁辽逸吉星侯依昕李纯正张玫珊李小兰贺欢叶鹏王欢
Owner STATE GRID LIAONING ECONOMIC TECHN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products