Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

36results about How to "Ease of commercial development" patented technology

Extra-high voltage power grid transverter wattless configuration method based on short-circuit ratio

The invention discloses a multi-infeed extra-high voltage power grid transverter wattless configuration method based on a short-circuit ratio. The extra-high voltage power grid transverter wattless configuration method comprises steps of 1) determining an object grid structure to be analyzed and related parameters, 2) arranging operation modes of an electric power system, 3) selecting a specific operation mode to calculate system load flows under different DC control modes, 4) calculating a multi-infeed short circuit ratio according to a load flow calculation result, 5) calculating a multi-infeed DC node voltage comprehensive improvement index, 6) determining a candidate node of the multi-infeed extra-high voltage DC power grid transverter wattless configuration n according to the multi-infeed DC node comprehensive improvement index, and 7) programming a single objective function optimization program according to an objective function to determine a wattless compensation capacity. The extra-high voltage power grid transverter wattless configuration method guarantees to reduce the operation cost of the power grid, guarantee the power grid to safely, reliably, economically, and efficiently operate, has significance and provides technical basis to planning design and operation control of the mmulti-infeed high voltage DC power grid.
Owner:STATE GRID CORP OF CHINA +3

Interactive game scheduling method for park integrated energy system group and power grid

PendingCN112598224ARealize decentralized coordination schedulingGuaranteed uptimeDesign optimisation/simulationResourcesIntegrated energy systemPower grid
An interactive game scheduling method for a park integrated energy system group and a power grid belongs to the technical field of integrated energy system operation and control, and is characterizedby comprising the following steps: (1) establishing output models and cost models of a conventional generator set, a distributed power supply, energy storage and other equipment; 2, establishing a park comprehensive energy system group and power grid collaborative optimization control framework; 3, establishing a power grid and park integrated energy system group game structure; (4) setting a threshold value, and judging whether an interactive game is performed or not; 5, establishing a park comprehensive energy system group and power grid interactive game model based on master-slave game; (6)establishing an interactive game scheduling Matlab platform of the park comprehensive energy system group and the power grid to solve an interactive process; and (7) performing simulation analysis onthe effectiveness of the interactive game scheduling strategy of the hierarchically coordinated park comprehensive energy system group and the power grid, and verifying that the interactive game scheduling strategy of the hierarchically coordinated park comprehensive energy system group and the power grid can realize stable and economic operation of the park comprehensive energy system group andthe power grid. According to the interactive game scheduling method adopted by the invention, cooperative optimization operation of the park comprehensive energy system group and the power grid can beeffectively and reliably carried out, and a technical basis and a practical method are provided for stable operation of the park comprehensive energy system group and the power grid.
Owner:STATE GRID LIAONING ECONOMIC TECHN INST +3

Distributed type fiber sensing device based on signal reusing perception and demodulation

The invention provides a distributed type fiber sensing device based on signal reusing perception and demodulation, comprising a laser, a first fiber coupler, a second fiber coupler, a light pulse modulator, a fiber annular device, an optical interface, a balance photoelectric detector, a low noise amplifier, a power divider, a first filter, a second filter, a frequency synthesizer, a mixer, a lowpass filter, a data collecting and processing module, and a computer. The feature that rayleigh scattering signals and Brillouin scattering signals can be generated at the same time is taken into consideration, and by means of the balance photoelectric detector, the rayleigh scattering signals and Brillouin scattering signals of the detection light pulse, generated in the detected fiber are simultaneously converted into radiofrequency signals of the corresponding frequency or frequency range. The rayleigh scattering signals and the Brillouin scattering signals are separated by means of the power divider and a band pass filter. The separated rayleigh scattering signals and the Brillouin scattering signals are accessed to the data collecting and processing module. The attenuation, vibration, and monitoring and displaying of the temperature and strain information of the fiber can be realized.
Owner:GLOBAL ENERGY INTERCONNECTION RES INST CO LTD +3

Flexible self-starting method of wind storage isolated network system

The invention discloses a flexible self-starting method for wind storage isolated network system, and belongs to the fields of grid operation and control technologies. The method is characterized by comprising the following steps: step 1) obtaining operating parameters of the wind storage isolated network system; step 2) determining the number of wind turbine units to be started; step 3) establishing a Petri network based power deviation prediction model of the wind storage isolated network system; step 4) an energy storage inverter performing master-slave control; step 5) adding power deviation control to a frequency control process; step 6) charging an inverter of the wind turbine units by using an energy storage device; step 7) the inverter starting to work to supply an excitation current to the wind turbine unit, and controling a stator voltage and a frequency converter DC voltage to reach nominal values; and step 8) incorporating the wind turbine units into an AC bus of the wind storage isolated network system. The flexible self-starting method adopted by the invention can effectively and reliably enable self-starting of the wind storage isolated network system, thereby providing a technical basis and a practical method for stable operation of the wind storage isolated network system.
Owner:SHENYANG INST OF ENG

Method for calculating load flow of power grid alternating current and direct current power transmission system based on state switching

InactiveCN103138279AFull and real operating statusReal running statusElectric power transfer ac networkPower gridEngineering
The invention discloses a method for calculating the load flow of a power grid alternating current and direct current power transmission system based on direct current system control logic, and belongs to the technical field of power grid alternating current and direct current power transmission. The method is characterized by including the steps: (1) acquiring steady-state operation parameters needed for calculating the load flow of the alternating current and direct current power transmission system; (2) building direct current control logic in load flow calculation; (3) determining a direct current power transmission system control mode according to the operation state of the system and the direct current control logic; (4) calculating the load flow of the alternating current and direct current power transmission system in the determined direct current control mode; (5) drawing a calculation conclusion if calculation finishing conditions are met; and (6) switching to the step (3) if the calculation finishing conditions are not met, and continuing to perform calculation. By the method, the load flow of the alternating current and direct current power transmission system can be more effectively and reliably calculated, and a basis is provided for planning and operating the alternating current and direct current power transmission system according the control mode and the switching process of the direct current power transmission system.
Owner:SHENYANG POLYTECHNIC UNIV

A reactive power optimization method for an UHV/AC/DC hybrid transmission system

The invention relates to a reactive power optimization strategy for an UHV AC/DC hybrid transmission system, belonging to the technical field of UHV AC/DC network operation and reactive power optimization. It can effectively play the role of inhibiting transient voltage rise after DC system fault, so as to reduce the number of high-voltage off-grid fans under the condition of ensuring large-scaleDC transmission. The method comprises the following steps: step 1, obtaining steady-state operation parameters required for power flow calculation of UHV AC/DC transmission system, including power ofeach power source and load point in the system, voltage of hinge point, voltage of equilibrium point and phase angle; 2, calculating the initial power flow and the initial value of the objective function of the UHV AC/DC transmission system according to the obtained operation parameters; 3, determining an objective function and a constraint condition of the steady-state operation of the system; 4,consider that objective function and the constraint conditions of the transient characteristic, and determining the constraint conditions of the generator rotor of the reactive power optimization strategy; Step 5, the particle swarm optimization algorithm is used to find the optimal solution to the obtained optimization data.
Owner:SHENYANG INST OF ENG

Wind storage isolated network power supply system coordination control method based on flexible coordination factors

The present invention discloses a wind storage isolated network power supply system coordination control method based on flexible coordination factors, belonging to the technical field of power grid operation and control. The method comprises the following steps of: (1) obtaining operation parameters of a wind storage isolated network power supply system; (2) establishing a coordination control mechanism of the wind storage isolated network power supply system, and achieving an interbehavior between an upper layer of coordination control intelligent agent and a lower layer of unit decentralized control intelligent agent through direct and indirect effects; (3) calculating flexible coordination factors of power balance of the wind storage power supply system; (4) allowing the upper layer ofcoordination control intelligent agent to distribute the flexible coordination factors into the lower layer of unit decentralized control intelligent agent; and (5) allowing an energy storage inverter to enforce power control. The wind storage isolated network power supply system coordination control method based on flexible coordination factors can achieve coordination control of each unit of the wind storage isolated network system, ensures the stability of the output voltage and frequency of the wind storage isolated network system and provides technical basis and a practical method for stable operation of the wind storage isolated network system.
Owner:SHENYANG INST OF ENG

High-energy-consumption park and power grid alternative parallel collaborative optimization scheduling method

PendingCN113393126AMeet the electrical load demandSatisfy power interactionResourcesInformation technology support systemIntegrated energy systemLoad following power plant
A high-energy-consumption park and power grid alternative parallel collaborative optimization scheduling method belongs to the technical field of integrated energy system operation and control, and comprises the following steps: (1) establishing output models and load prediction models of a conventional generator set, a distributed power supply, energy storage and other equipment; (2) carrying out day-ahead prediction on park side electric and thermal loads, photovoltaic output and a power grid side wind generating set; (3) establishing a park integrated energy system group and power grid decomposition collaborative optimization framework; (4) establishing a high-energy-consumption park integrated energy system and power grid parallel decomposition collaborative optimization scheduling model considering network security constraints; (5) establishing a solving process based on a parallel alternating direction multiplier method; and (6) establishing a high-energy-consumption park integrated energy system and power grid parallel decomposition collaborative optimization scheduling Matlab platform solving interaction process. The invention provides a technical basis and a practical method for stable operation and large-scale wind power consumption of the park comprehensive energy system group and the power grid.
Owner:SHENYANG INST OF ENG

Active power distribution network multi-level redundant coordinated control method considering electric vehicle and energy storage

InactiveCN108110801ARealization of Multi-level Redundant Coordinated ControlImprove reliabilityCharging stationsLoad forecast in ac networkNew energyEngineering
The invention discloses an active power distribution network multi-level redundant coordinated control method considering an electric vehicle and energy storage and belongs to the new energy coordinated control technological field. The method is characterized by including the following steps that: 1, the operation data of an active distribution network are obtained; 2, the load characteristic model of the electric vehicle is established; 3, the energy storage and release characteristic model of the energy storage is established; 4, the multi-level redundant coordinated control strategy of theactive distribution network containing the electric vehicle and energy storage is constructed; and 5, the multi-level redundant coordinated control of a daily scheduling model, a hourly scheduling model and a real-time scheduling model is solved. According to the method of the invention, starting from the active distribution network, the active power distribution network multi-level redundant coordinated control method considering the electric vehicle and energy storage is researched on the basis of the idea of redundant interval division, and a promotion foundation and technical support can be provided for the further development of new energy sources such as electric vehicles.
Owner:STATE GRID CORP OF CHINA +3

Wind, light, storage and heat multi-energy flexibly-complementary active power distribution load reconstruction method

The invention discloses a short circuit ratio-based multi-infeed ultra-high voltage direct current power grid converter reactive power configuration method. The method comprises the following steps that: step 1, adjacent date and historical load data and wind/light power generation power data are obtained; step 2, wind and light power generation power and daily load are predicted; sep 3, the equivalent daily load curve of a prediction date is constructed; step 4, the area of a wind power generation curve is calculated; step 5, heat storage capacity is calculated; step 6, an area under the loadcurve is solved through adopting a Monte-Carlo algorithm curve area solution method, and the heat storage capacity in an active power distribution network is matched with peak load; and step 7, an equal-area replacement method is adopted to reconstruct the equivalent daily load curve according to a matching result satisfying requirements. With the method provided by the invention adopted, a wind,light, storage, and heat multi-energy flexibly-complementary active power distribution load can be reconstructed more safely, economically, reliably and effectively; and a technical base and practical method can be provided for the safe, economic and efficient dispatching of the active power distribution network.
Owner:STATE GRID CORP OF CHINA +3

Industrial park group and regional power grid coordinated comprehensive energy system planning method

The invention belongs to an industrial park group and regional power grid coordinated comprehensive energy system planning method, belongs to the technical field of power grid operation and control, and is characterized by comprising the following steps: (1) acquiring information data of a single industrial park; (2) establishing a comprehensive energy system optimization planning model of a single industrial park; (3) acquiring information data of the whole planning area; (4), establishing a regional power grid comprehensive energy system optimization planning model; (5), establishing industrial park group and regional power grid collaborative planning constraint conditions; (6) calculating a strategy of the comprehensive energy system model based on a seagull optimization algorithm; and(7) obtaining configuration information of the system model equipment through a resolving strategy, and guiding regional energy equipment configuration construction. According to the planning method adopted by the invention, comprehensive energy system planning can be economically and reliably guided, and a technical basis and a practical method are provided for collaborative planning of industrial park groups and regional power grids.
Owner:STATE GRID LIAONING ECONOMIC TECHN INST +3

Ultra-high-voltage AC power grid high-voltage reactor optimization configuration method

The invention discloses an ultra-high-voltage AC power grid high-voltage reactor optimization configuration method, which comprises the steps: 1) determining a target framework structure of an ultra-high-voltage grid; 2) obtaining parameters of each electronic component in the ultra-high-voltage AC power grid; 3) establishing ultra-high-voltage power grid electromechanical transient and electromagnetic transient simulation models based on an ADPSS; 4) arranging system operation modes; 5) carrying out operating characteristic analysis on the ultra-high-voltage AC power grid having no parallel high-voltage reactors; 6) carrying out operation characteristic simulation calculation and analysis on the ultra-high-voltage power grid with installation position and compensation degree of the high-voltage reactor being taken into overall consideration; 7) calculating minimum level index of reactive play of the ultra-high-voltage AC power grid; 8) establishing an objective function according to relation of the reactive play of the ultra-high-voltage AC power grid, transmitting power and the compensation degree; 9) determining optimal compensation degree; 10) carrying out optimization configuration on the reactor of the ultra-high-voltage AC power grid; and 11) checking safety and stability of the ultra-high-voltage AC power grid. The method can be used for ultra-high-voltage AC power grid high-voltage reactor optimization configuration.
Owner:STATE GRID CORP OF CHINA +3

Integrated energy system collaborative scheduling method based on source-load double-side interactive game

The invention belongs to the technical field of integrated energy system operation and control, and particularly relates to an integrated energy system collaborative scheduling method based on a source-load double-side interactive game. The method comprises the following steps: (1) inputting initial data, including initial electricity, gas and heat load curves, parameters of each device in a service provider and an initial energy price formulated by an energy supplier; (2) establishing a park-level integrated energy system source-load interactive game framework; (3) establishing a source-load interactive game structure of the park-level integrated energy system; (4) establishing a park-level integrated energy system multi-energy collaborative optimization scheduling model based on a source-load double-side interactive game; (5) establishing a park-level integrated energy system multi-energy collaborative optimization scheduling Matlab platform solving interaction process based on a source-load double-side interaction game; and (6) carrying out simulation analysis on the multi-energy collaborative optimization scheduling effectiveness of the park-level integrated energy system based on the source-load double-side interactive game. According to the invention, the complementation and substitution effects of various energy sources can be fully exerted.
Owner:SHENYANG INST OF ENG

Wind power plant signal feature extraction and de-noising data optimization method

The invention belongs to the technical field of data processing, and particularly relates to a wind power plant signal feature extraction and de-noising data optimization method. Comprising the steps of 1, obtaining wind power plant measurement signal parameters; 2, EEMD parameters in the measurement signals are obtained; step 3, establishing a Hilbert-Huang transform model of a white noise clustering empirical method according to the measured signal parameters; 4, analyzing to obtain a signal, and determining the length of a filtering window; step 5, sampling the number m of points for the analysis signal; step 6, setting the number of iterations K; 7, calculating derivative values and an average value of each point of the analysis signal sampling points; step 8, calculating and analyzing the weight of each point in the signal filtering window to de-noise each signal point; step 9, performing iteration for K times; and step 10, obtaining an accurate wind power plant analysis signal characteristic value. The method can effectively and accurately perform signal feature extraction and de-noising optimization of the wind power plant, is easy to implement, and has a wide market application prospect.
Owner:STATE GRID LIAONING ELECTRIC POWER RES INST +2

Double-layer pricing method for energy storage aggregation platform

The invention belongs to the technical field of power system economy, and particularly relates to a double-layer pricing method for an energy storage aggregation platform. The method aims at a distributed energy storage and aggregation platform and a pricing mode between the aggregation platform and a power grid; in the first layer, the aggregation platform concentrates and disperses distributed energy storage and prices through a long-term contract, and in the second layer, the power grid prices different aggregators through real-time electricity prices. According to the method, the power deviation prediction model of the wind storage isolated network system is established, power and voltage regulation is implemented under the condition of considering the power deviation, and the reliability and practicability of self-starting of the wind storage isolated network system are greatly improved. According to the double-layer pricing method, pricing of the energy storage aggregation platform is effectively and reliably carried out, and a technical basis and a practical method are provided for double-layer pricing of the energy storage aggregation platform; and the distributed energy storage pricing efficiency is effectively improved, complex pricing of a large number of energy storage devices by a power grid is simplified, implementation is easy, commercialized development is facilitated, and the method has good commercial development prospects.
Owner:STATE GRID LIAONING ELECTRIC POWER RES INST +2

Method for calculating load flow of power grid alternating current and direct current power transmission system based on state switching

InactiveCN103138279BFull and real operating statusReal running statusElectric power transfer ac networkControl mannerPower grid
The invention discloses a method for calculating the load flow of a power grid alternating current and direct current power transmission system based on direct current system control logic, and belongs to the technical field of power grid alternating current and direct current power transmission. The method is characterized by including the steps: (1) acquiring steady-state operation parameters needed for calculating the load flow of the alternating current and direct current power transmission system; (2) building direct current control logic in load flow calculation; (3) determining a direct current power transmission system control mode according to the operation state of the system and the direct current control logic; (4) calculating the load flow of the alternating current and direct current power transmission system in the determined direct current control mode; (5) drawing a calculation conclusion if calculation finishing conditions are met; and (6) switching to the step (3) if the calculation finishing conditions are not met, and continuing to perform calculation. By the method, the load flow of the alternating current and direct current power transmission system can be more effectively and reliably calculated, and a basis is provided for planning and operating the alternating current and direct current power transmission system according the control mode and the switching process of the direct current power transmission system.
Owner:SHENYANG POLYTECHNIC UNIV

A Coordinated Control Method for Wind Storage Isolated Grid Power Supply System Based on Flexible Coordination Factor

The invention discloses a coordinated control method for an isolated wind storage grid system based on a flexible coordination factor, and belongs to the technical field of power grid operation and control. Its characteristics include the following steps: ① Obtain the operating parameters of the wind storage isolated grid power supply system; ② establish a coordinated control mechanism for the wind storage isolated grid power supply system; realize the upper coordinated control agent and the lower unit decentralized control agent through direct and indirect actions ③ Calculate the flexible coordination factor of the power balance of the wind storage isolated grid power supply system; ④ The upper layer coordination control agent distributes the flexible coordination factor to the lower energy storage unit decentralized control agent; ⑤ The energy storage inverter implements power control. The coordinated control method of the wind storage isolated grid power supply system based on the flexible coordination factor adopted in the present invention can realize the coordinated control of each unit in the wind storage isolated grid system, and ensure the stability of the output voltage and frequency of the wind storage isolated grid system. The stable operation of the isolated grid storage system provides technical basis and practical methods.
Owner:SHENYANG INST OF ENG

A flexible self-starting method for wind storage isolated grid system

The invention discloses a flexible self-starting method for wind storage isolated network system, and belongs to the fields of grid operation and control technologies. The method is characterized by comprising the following steps: step 1) obtaining operating parameters of the wind storage isolated network system; step 2) determining the number of wind turbine units to be started; step 3) establishing a Petri network based power deviation prediction model of the wind storage isolated network system; step 4) an energy storage inverter performing master-slave control; step 5) adding power deviation control to a frequency control process; step 6) charging an inverter of the wind turbine units by using an energy storage device; step 7) the inverter starting to work to supply an excitation current to the wind turbine unit, and controling a stator voltage and a frequency converter DC voltage to reach nominal values; and step 8) incorporating the wind turbine units into an AC bus of the wind storage isolated network system. The flexible self-starting method adopted by the invention can effectively and reliably enable self-starting of the wind storage isolated network system, thereby providing a technical basis and a practical method for stable operation of the wind storage isolated network system.
Owner:SHENYANG INST OF ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products