Problems solved by technology

Under the above calculation strategy, the solution process of the model is complicated, the algorithm structure is complicated, the parameter settings are too many, the solution time is long, and the relative error is large, etc., and the application has great limitations, which is not conducive to the multi-stage planning and commercialization of the park's comprehensive energy system. slow operation, poor practicability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Seagull-optimization-algorithm-based park integrated energy system multi-stage planning method
  • Seagull-optimization-algorithm-based park integrated energy system multi-stage planning method
  • Seagull-optimization-algorithm-based park integrated energy system multi-stage planning method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0070] The multi-stage planning method of integrated energy system based on seagull optimization algorithm proposed by the present invention. Based on the multi-stage planning constraints of the park's comprehensive energy system, the multi-stage planning model of the park's comprehensive energy system is optimized and calculated based on the seagull optimization algorithm, thereby greatly improving the reliability and economy of the park's comprehensive energy system's multi-stage planning.

[0071] The technical solution given by the present invention is: for a multi-energy coupling system composed of users with various energy needs and various energy coupling devices, the energy equipment coupling model and system model are established according to the coupling characteristics of the multi-energy equipment, Considering the timing of the planning and construction of the integrated energy system, a multi-stage planning model of the integrated energy system of the park is estab...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of power grid operation and control, and particularly relates to a multi-stage planning method for a park integrated energy system based on a seagull optimization algorithm. A technical basis and a practical method are provided for multi-stage planning of the park comprehensive energy system. The method comprises the following steps: acquiring park integrated energy system planning information; establishing an energy coupling equipment model according to the planning information; establishing a park comprehensive energy system model; establishing a basic framework of the multi-stage planning method; establishing a park integrated energy system multi-stage planning model; establishing multi-stage planning constraint conditions of the park integrated energy system; solving the established park integrated energy system multi-stage planning model based on a seagull optimization algorithm; and through optimization calculation, obtaining multi-stage planning configuration information of the park integrated energy system based on gull-sea optimization algorithm iterative calculation, and guiding configuration construction of park energy equipment.

Description

technical field [0001] The invention belongs to the technical field of power grid operation and control, and in particular relates to a multi-stage planning method for park comprehensive energy systems based on seagull optimization algorithms. Background technique [0002] Traditional industrial parks generally lack unified energy planning and face huge challenges in terms of energy waste and energy shortage. At the same time, as far as the grid is concerned, on the one hand, it is limited by factors such as grid transmission capacity and stable operation requirements, and the grid's ability to accept new energy is insufficient; at the same time, the access of new energy changes the comprehensive load characteristics of the grid and affects the security of the grid. For the integrated energy system, blind single-stage planning does not fully consider the rationality of the later operation of the integrated energy system. For the above situation, there is currently no effect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06N3/00G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/06393G06N3/006G06Q50/06
Inventor 叶鹏杨硕关多娇屈科明刘思奇王士元王枫淇李天岳魏靖晓张政斌杨宏宇王子赫邵旸棣
Owner SHENYANG INST OF ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products