A gas phase regulating unit for the next tower and a next tower with a gas -containing regulating unit
A technology of adjusting unit and dividing wall column, applied in the field of rectification column, can solve the problems such as difficulty in adjusting the gas phase ratio
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0056] The liquid phase from the upper tray 5 or the packing falls on the liquid holding plate 11 through the downcomer 6 to form a certain liquid level, and the liquid level height exceeds the lowest position of the downcomer plate 14 . The liquid phase is transported to the liquid phase distributor 9 through a pump or regulating valve, and then distributed to the lower tray or packing. The gas phase rises from the lower tray or packing, passes through the gas lift cylinder 8, passes through the gas phase channel 2 on the regulator 1, and then enters the upper tray 5 or packing through the gas distributor 4.
[0057] When it is necessary to increase the gas flow rate on one side, the opening area of the gas phase channel 2 on the regulator 1 is larger, and a few are blocked by the gas lift cylinder 8, which shows that the regulator 1 and the floating tank 3 rise, and the pressure drop decreases and the gas phase The opening area of the channel 2 increases, and the gas flo...
Embodiment 1
[0063] use figure 1 and image 3 The structures (or processes) shown are performed.
[0064] Due to the fluctuation of upstream raw materials, in order to meet the separation requirements of the dividing wall column, the gas flow rate on the left side of the dividing wall needs to be increased by 10%.
[0065] t 0 At the moment FIC-101 reads 500m 3 / h, PDC-101 reading is 1000Pa; FIC-102 reading is 500m 3 / h, the indication of PDC-102 is 1000Pa; the left gas phase channel exceeds the gas lift cylinder by 10cm, and the right gas phase channel exceeds the gas lift cylinder by 10cm.
[0066] At this time, it is necessary to slowly reduce the flow of the flow regulator (at this time, the adjustment pump), and observe the reading of the left flowmeter FIC-101. When the FIC-101 reading reaches 550m 3 / h, maintain for 10 minutes, and start the cascade control of FIC-101 and PDC-101. At this time, the reading of PDC-101 is 970Pa, and the reading of FIC-102 is 500m 3 / h, the indi...
Embodiment 2
[0068] use figure 1 and image 3 The structures (or processes) shown are performed.
[0069] Due to the fluctuation of upstream raw materials, in order to meet the separation requirements of the dividing wall column, the gas flow rate on the left side of the dividing wall needs to be reduced by 20%.
[0070] t 0 At the moment FIC-101 reads 500m 3 / h, PDC-101 reading is 1000Pa; FIC-102 reading is 500m 3 / h, the indication of PDC-102 is 1000Pa; the left gas phase channel exceeds the gas lift cylinder by 10cm, and the right gas phase channel exceeds the gas lift cylinder by 10cm.
[0071] At this time, it is necessary to slowly increase the flow rate of the flow regulator (at this time, the adjustment pump), and observe the reading of the left flowmeter FIC-101. When the FIC-101 reading reaches 400m 3 / h, maintain for 10 minutes, and start the cascade control of FIC-101 and PDC-101. At this time, the reading of PDC-101 is 1050Pa, and the reading of FIC-102 is 500m 3 / h, th...
PUM