Embodiment 1
[0034] A method for determining the parameters of the short-term aging test of SBS modified asphalt, the method is realized by the following steps:
[0035] S1: Sampling of SBS modified asphalt: Take the SBS modified asphalt sample from the construction site to obtain the original;
[0036] S2: Indoor aging of the original: Prepare seven test samples with the original sample taken in step S1, and put each test sample into a film heating oven for film heating test, obtain the residue after film heating, and test seven test samples The temperature is 180°C, and the aging time t of the seven test samples is 85min, 180min, 270min, 300min, 360min, 450min, 540min;
[0037] S3: Determination of the original penetration and residue penetration: Determination of the original penetration P 0 and each residue penetration P in step S2 i , i=1,...,7;
[0038] S4: The establishment of the nonlinear aging equation of SBS modified asphalt: the aging time t in step S2 i , the original need...
Embodiment 2
[0054] A method for determining the parameters of the short-term aging test of SBS modified asphalt, the method is realized by the following steps:
[0055] S1: Sampling of SBS modified asphalt: Take the SBS modified asphalt sample from the construction site to obtain the original;
[0056] S2: Indoor aging of the original: Prepare seven test samples with the original sample taken in step S1, and put each test sample into a film heating oven for film heating test, obtain the residue after film heating, and test seven test samples The temperature is 180°C, and the aging time t of the seven test samples is 85min, 180min, 270min, 300min, 360min, 450min, 540min;
[0057] S3: Determination of the original penetration and residue penetration: Determination of the original penetration P 0 and each residue penetration P in step S2 i , i=1,...,7;
[0058] S4: The establishment of the nonlinear aging equation of SBS modified asphalt: the aging time t in step S2 i , the original need...
Embodiment 3
[0074] A method for determining the parameters of the short-term aging test of SBS modified asphalt, the method is realized by the following steps:
[0075] S1: Sampling of SBS modified asphalt: Take the SBS modified asphalt sample from the construction site to obtain the original;
[0076] S2: Indoor aging of the original: Prepare seven test samples with the original sample taken in step S1, and put each test sample into a film heating oven for film heating test, obtain the residue after film heating, and test seven test samples The temperature is 180°C, and the aging time t of the seven test samples is 85min, 180min, 270min, 300min, 360min, 450min, 540min;
[0077] S3: Determination of the original penetration and residue penetration: Determination of the original penetration P 0 and each residue penetration P in step S2 i , i=1,...,7;
[0078] S4: The establishment of the nonlinear aging equation of SBS modified asphalt: the aging time t in step S2 i , the original need...