Coral sand foundation pile using expansion agent and construction method
A technology of expansion agent and coral sand, which is applied in infrastructure engineering, soil protection, construction, etc., can solve the problems of increasing effective pressure of coral sand particles, reducing coral sand pore water pressure, and unqualified projects, so as to improve the side The effect of wall friction resistance, meeting the bearing requirements, and improving strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] see Figure 1-3 , a coral sand foundation pile utilizing an expansion agent, it comprises a carrier pile 3, the carrier pile 3 is evenly embedded in the interior of the coral sand foundation 1, and the bottom position of the carrier pile 3 is provided with a lower tamping filler area 4; the bottom tamping filler area 4 is filled with expansion agent 2, and a bottom expansion head structure is formed; the outer side wall of the carrier pile 3 is provided with a plurality of side wall extension expansion head branches 5 along its height direction, The expansion agent 2 and the magnetic mortar 7 are filled inside the side wall extension head branch 5 , and an electromagnet device 6 for controlling the fluidity of the magnetic mortar 7 is arranged inside the side wall extension head branch 5 . By adopting the foundation pile of the above-mentioned structure, the expansion agent is added to the bottom expansion area of the carrier pile and the extension head branch area of...
Embodiment 2
[0046] The construction method of coral sand foundation pile using expansion agent includes the following steps:
[0047] Step1: Forming the pile hole: The drilling rig completes the construction of the pile hole according to the design depth and hole diameter requirements, and then completes the preliminary construction of the lower part of the carrier pile 3 and the filling material area 4 and the expansion head branch 5 area of the side wall, and the formed pile is completed. Corresponding measures are taken to protect the holes, and the holes at the branch 5 of the sidewall extension head are protected;
[0048] Step2: Side wall construction: Place the electromagnet device 6 in the 5 hole of the side wall extension head branch, turn on the power switch, and then pour the prepared magnetic material containing the expansion agent 2 into the 5 hole of the side wall extension head branch. Mortar 7 shall be supported in time after the pouring is completed until the expansion ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com