Subway foundation pit deep-buried karst cave treatment method
A treatment method and technology of karst caves, applied in infrastructure engineering, construction, etc., can solve problems such as damage to residents’ property, large economic losses, and shutdown of construction projects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The technical solutions of the present invention are further described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the following.
[0028] like figure 1 As shown in the figure, a method for treating deep buried karst caves in subway foundation pits includes the following steps: construction preparations, mastering and understanding the general situation of the karst grouting project in the construction area, completing the construction site leveling, measuring and laying out lines, and laying out settlement observation piles; then Carry out process tests to determine the filling materials, grouting materials and the ratio parameters of grouting materials for the cave, select appropriate filling materials, and prepare the grouting material; then drill holes and carry out construction edge exploration of the cave to determine the type of cave and the position of the hole; then re-grouting...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com