Anti-loosening overall dismounting device for temporary inhaul cable clamping piece of prestressed steel strand
A technology of prestressed steel strands and dismantling devices, which is applied in the direction of erecting/assembling bridges, bridges, buildings, etc., and can solve the problem of decreasing pressure between the tapered clip and the anchor plate, loosening and springback of the cable tapered clip, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Temporary cables are normally anchored, such as Figure 1~4 As shown, the specific anchoring process is as follows:
[0029] The first step is to form a detachable clip 1 with multiple clips, and put it into the groove of the sleeve 2;
[0030] In the second step, the prestressed beam 3 that needs to be stretched passes through the holes reserved on the anchor plate 5, the detachable clip 1, the sleeve 2 and the special limiting plate 7, and the position of the special limiting plate 7 is adjusted. ; The special limiting plate 7 has a deep groove, which is used to accommodate the detachable clip 1 with the sleeve 2, and a hole is reserved at the position where the prestressed beam 3 passes, which is only used for the tension of the prestressed beam 3 process, and can also play the role of a counter force frame.
[0031] In the third step, the jack is placed on the rear end of the special limiting plate 7, and the normal tensioning process is carried out;
[0032] The...
Embodiment 2
[0036] Remove the anchorage. When the temporary cable is used, the anchorage needs to be removed, such as Figure 5 As shown, the specific anchor unloading process is as follows:
[0037] The first step is to loosen the screw rod 6, and separate the cover plate 4 from the anchor plate 5 by a certain distance, so that the groove in the sleeve 2 no longer abuts against the protruding ring at the end of the detachable clip 1;
[0038] The second step is to place the reaction force seat 8, and put the anchor unloading jack on the reaction force seat 8 at the rear end of the cover plate 4;
[0039] The third step is to carry out the overall tensioning when unloading the anchor. When tensioning, the cover plate 4 is used to drive the sleeve 2 and the detachable clip 1 to withdraw from the anchor hole of the anchor plate 5 for a certain distance, and then the tension is performed;
[0040]The fourth step repeats the operation process of the third step until the cover plate 4 drives ...
Embodiment 3
[0042] Further, another structure of the detachable clip 1 is to use the gap between the two clips to make the raised ring snap into the groove on the inner wall of the sleeve 2, so that the sleeve 2 can be connected with the Disassemble the connection of clip 1. This connection method has unstable connection. For example, under external influences such as vibration, there is only a gap between the two clips. At this time, it will not only affect the detachable clip 1. The connection effect with the sleeve 2, and the detachable clip 1 is also easy to cause cutting effect on the prestressed beam 3, forming a safety hazard. In order to solve this disadvantage, at the same time ensure that the cover plate 4 can be used to disassemble the detachable clip 1 and the sleeve 2 as a whole when disassembling the anchorage, so that the two adjacent clips of the detachable clip 1 are far away from the end of the raised ring to form a A certain included angle, so that the clip flaps are be...