Wild animal loading structure and method
A technology for wild animals and animals, which is applied in the field of wild animal loading structures, can solve problems such as infection, trouble, and decreased body resistance, and achieve the effect of reducing stress response
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Please refer to figure 1 , shows a wild animal loading structure provided by this embodiment, and the specific structure is as follows.
[0039] The embodiment of the present application provides a loading structure for wild animals, which includes sequentially connected animal transport vehicles 1, animal loading ramps 2, loading passages 3, and pens 4. The animal transport vehicles 1 are provided with transport boxes 101, and transport The box 101 is connected with the animal boarding ramp 2, the animal boarding ramp 2 is provided with a shelter enclosure 201, and the loading channel 3 is provided with a concealed observation compartment 301 facing the animal boarding ramp 2. combine figure 1 As shown, the animal transport vehicle 1 is used for transporting large animals such as elk. One end of the animal loading ramp 2 is connected to the animal transport vehicle 1, and the other end is connected to the loading channel 3, which is used for allowing the elk to walk ...
Embodiment 2
[0053] This embodiment provides a method for loading animals, which includes the above-mentioned wild animal loading structure, and further includes the following steps,
[0054] S1. Site preparation: Find a flat site with a suitable size. Use steel pipes, scaffolding, and wooden boards to build animal ramps 2, loading passages 3, and enclosures 4. Take the soil from the elk living area, and put the soil Stir and mix with the urine and excrement of elk to form a soil mixture, spread the soil mixture on the ground of the loading channel 3, and prepare enough clean drinking water in the primary preparation enclosure 401, and prepare feed in the feed tank 4012.
[0055] S2. Animal preparation: After the field preparation is completed, the elk is transferred to the primary preparation enclosure 401 7 days in advance (in other embodiments, it can be more than 7 days) for feeding and quarantine, and adapts to the environment of the primary preparation enclosure 401. According to the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com