Distribution network equipment capacity and line type selection configuration optimization method and system
A technology for equipment capacity and configuration optimization, applied in design optimization/simulation, computer-aided design, instruments, etc., can solve the problem of lack of long-term operation cost considerations of distribution network, etc., and achieve long-term economic and safety effects.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0071] This embodiment proposes a distribution network equipment capacity and line selection configuration optimization method, such as figure 1 As shown in FIG. 2 , it is a flow chart of the method for optimizing the distribution network equipment capacity and line type selection and configuration in this embodiment.
[0072] The distribution network equipment capacity and line selection configuration optimization method proposed in this embodiment includes the following steps:
[0073] S1. Collect distribution network frame data, historical operation data and equipment information that can be selected for planning.
[0074] S2. Establish a life cycle cost calculation model.
[0075] S3. Determine the planning scope of distribution network equipment and line selection;
[0076] S4. According to the collected distribution network frame data, historical operation data and equipment information that can be selected for planning, carry out scheme traversal and collocation based...
Embodiment 2
[0082] This embodiment proposes a distribution network equipment capacity and line selection configuration optimization method, which includes the following steps:
[0083] S1. Collect distribution network frame data, historical operation data and equipment information that can be selected for planning.
[0084] In this embodiment, the collected distribution network grid data includes the grid topology result, the length of each segment of the grid line, and the impedance value of each segment of the grid line. The collected historical operation data includes the load data of each node of the network frame on the day of the highest load in the distribution network history. The collected equipment information that can be selected for planning includes distribution transformer type, distribution transformer capacity, distribution transformer construction cost, line model, line unit impedance and line construction cost.
[0085] S2. Establish a life cycle cost calculation model....
Embodiment 3
[0134] This embodiment applies the distribution network equipment capacity and line selection configuration optimization method proposed in Embodiment 2, and uses the generalized model of a 10kV radial distribution network as a simulation example, as shown in image 3 Shown is the simulation distribution network topology diagram of this embodiment.
[0135] Among them, the planning scope of this embodiment is: the type and capacity of the distribution transformer equipment of nodes 4, 7, 10, 14, and 21, and the selection of the three-section lines of 1-10, 3-14, and 9-21. Four gradients of 3, 5, 8, and 10 years. The data information of distribution transformer equipment and lines is shown in Table 1 below.
[0136] Table 1 Data information of distribution transformer equipment and lines
[0137]
[0138] In this example, the length of the line between two adjacent nodes is 0.5km, the annual load growth rate is 5%, the discount rate is 10%, the comprehensive electricity pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com