Blended composite modified asphalt and preparation method thereof
A composite modified asphalt and blending technology, which is applied in the preparation of the blended composite modified asphalt, modified asphalt materials, and blended composite modified asphalt, which can solve the problem of complex equipment and large amount of polymer used in modified asphalt materials , high temperature rigidity, low temperature flexibility and temperature sensitivity are not ideal, to achieve low price, improve the comprehensive waterproof performance of asphalt, and alleviate the effect of white pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037]Take by weight 2% waste packaging polymer EVA, 5% waste tire powder, 90.5% matrix asphalt, 0.5% divinylbenzene, 2% p-toluenesulfonic acid at a temperature of 150 ° C. Melt the weighed base asphalt, add waste packaging polymer EVA and waste tire powder to the melted base asphalt, keep the temperature constant, manually stir for 20 minutes, add divinylbenzene and p-toluenesulfonic acid, and stir with shears 100min to obtain the blended composite modified asphalt.
Embodiment 2
[0039] Take by weighing 6% waste packaging polymer EVA, 15% waste tire powder, 77.98% matrix asphalt, 0.02% divinylbenzene, 1% p-toluenesulfonic acid according to mass percentage, and put The weighed base asphalt is melted, waste packaging polymer EVA and waste tire powder are added to the melted base asphalt, the temperature is kept constant, manual stirring is carried out for 40 minutes, divinylbenzene and p-toluenesulfonic acid are added, and shearing machine is stirred After 120 minutes, the blended composite modified asphalt was obtained.
Embodiment 3
[0041] Take by weighing 6% waste packaging polymer EVA, 2% waste tire powder, 89.5% matrix asphalt, 0.5% divinylbenzene, 2% p-toluenesulfonic acid according to mass percentage, and put them at a temperature of 160°C Melt the weighed base asphalt, add waste packaging polymer EVA and waste tire powder to the melted base asphalt, keep the temperature constant, manually stir for 30 minutes, add divinylbenzene and p-toluenesulfonic acid, and stir with shears After 120 minutes, the blended composite modified asphalt was obtained.
PUM
Property | Measurement | Unit |
---|---|---|
softening point | aaaaa | aaaaa |
penetration | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com