Grading seabed pipeline construction method via ditching twice and stopping bending through preheating
A technology for submarine pipelines and construction methods, applied in pipeline protection, pipeline laying and maintenance, pipeline heating/cooling, etc., can solve the problems of difficult detection and maintenance and high cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0012] Such as figure 1 As shown, during the laying process of the submarine pipeline, the pipeline sections at positions 3, 5, and 7 are laid on the seabed in an arc, and these three sections of pipeline are used as reserved pipeline sections, and trenches are dug and immersed in other locations of the pipeline. The reserved lengths of the three sections 3, 5, and 7 of the pipeline should meet the following two conditions: ①Only lateral buckling of the first-order mode generally occurs in the pipeline section under this length; ②The lateral buckling of the pipeline section after preheating The wavelength is long enough, the buckling amplitude is not too large, the process occurs slowly, and the induced stress concentration is acceptable. Therefore, the reserved length of the three sections 3, 5, and 7 should be calculated in advance according to the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com