On-line management method for engineering project

A technology of engineering projects and management methods, applied in the field of online management of engineering projects, can solve the problems of failure to achieve the combination of goals and responsibilities in progress management, difficulties in achieving progress goals, delays in progress goals, handling goal changes, and lack of strict supervision in adjustments, etc.

Active Publication Date: 2013-06-05
BEIJING JIANLONG HEAVY IND GROUP
View PDF5 Cites 112 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although it is already an Internet-based schedule management method, it only realizes the synchronous display of the schedule plan and completion status on the Internet, and the schedule management does not realize the combination of goals and responsibilities. At the same time, the delay processing of schedule goals and the change and adjustment of goals lack strict regulations. Supervision, making it difficult to achieve progress targets

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • On-line management method for engineering project
  • On-line management method for engineering project
  • On-line management method for engineering project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0145] see Figure 1 to Figure 3 , an online management method for an engineering project, said method comprising a project establishment decision management module, a design management module, a progress management module, a quantity analysis module, a contracting and contract management module, a quality management module, an expense management module, and a fixed assets carryover module , On-site construction management module, contracting enterprise management module, industrial safety and environmental protection management module, graphic data module, project performance module, comprehensive management and query module, verification and difference module, authorization management module;

[0146] The project approval decision-making module implements the management of the project approval process, the management of government project approval materials and the processing of unimplemented project cancellation cases;

[0147] The design management module implements design...

Embodiment 2

[0273] see Figure 4 , Figure 5 , in this embodiment, an online management method of an engineering project, the interactive personnel exchange information according to a remote interactive platform, and the remote interactive platform includes a server-side computer system 1, a budget-side computer device 2, a plurality of contractors Enterprise end computer device 3, multiple evaluation end computer devices 4, application end computer device 5, multiple review end computer devices 6, multiple review end computer devices 7; the server end computer system, budget end computer device, contractor The computer device at the enterprise end, the computer device at the evaluation end, the computer device at the application end, the computer device at the review end, and the computer device at the audit end are in a wide area network environment and are connected to the network. The wide area network environment is an Internet-based network domain environment, and the The server-en...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an on-line management method for an engineering project. According to the on-line management method for the engineering project, based on a remote interaction platform, through data transmission and data processing between a budget end computer device, a plurality of contracting enterprise end computer devices, a plurality of evaluation end computer devices, an application end computer device, a plurality of submission end computer devices, a plurality of checking end computer devices and a server end computer system, on-line bidding and tendering and bid evaluation of the engineering project are achieved, and on-line evaluation and on-line making of an engineering project progress plan of a contracting enterprise of the engineering project, on-line tracking of engineering project progress completion conditions, response and management of engineering project progress abnormal conditions, on-line generation of an engineering project quality acceptance report form, one-line application for engineering project progress payment, and on-line generation of engineering project budget by material and labor cost analysis are achieved.

Description

technical field [0001] The present invention relates to an online management method for engineering projects. The method is based on a remote interactive platform, through a computer device at the budget end, a computer device at the contractor end, a computer device at the evaluation end, a computer device at the application end, a computer device at the review end, and a computer at the audit end. The data transmission and data processing between the device and the server-side computer system realize the online management of the engineering project. Background technique [0002] In the existing technology, the most widely used engineering project management software is mostly stand-alone version. With the rapid development of Internet technology, in order to improve the management efficiency and modern management level of engineering projects, the online management of engineering projects based on the Internet is The inevitable trend of future development. Chinese patent ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 李占国牛立群郭锋
Owner BEIJING JIANLONG HEAVY IND GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products