A technology for concrete dams and layout structures, applied in the direction of cable cranes, traditional hydroelectric energy sources, cranes, etc., can solve the problems of large-scale excavation, large engineering volume and large engineering investment, so as to reduce engineering volume, save engineering investment, and overall simple layout effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:
[0011] The working principle of the medium and high-speed cable machine system of the present invention is the same as that of the prior art, and reference can be made to the prior art, so it will not be described again. The difference between the present invention and the prior art is that the layout structure of the medium and high-speed cable machine system is different, which will be described in detail below:
[0012] Such as figure 1 , 2 Shown, the arrangement structure of the high-speed cable crane system of the narrow valley high steep abutment concrete dam of the present invention, the medium-speed cable crane system includes the cross-river cable 1 of the running crane, and the abutment 9 on one side is used for fixing the cross-river cable The fixed end 2 of the cable machine at one end, the mobile end 12 of the cable machine locate...