Electric power information communication scheduling and monitoring platform

A communication scheduling and monitoring platform technology, applied in data processing applications, instruments, computing and other directions, can solve problems affecting business opening, idle network resources, network management lag, etc., to improve system security, reduce security risks, and achieve real-time management effect

Inactive Publication Date: 2014-02-19
STATE GRID LIAONING ELECTRIC POWER RES INST
View PDF0 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the development of the company's network, the network capacity is becoming larger and larger, and new equipment emerges in an endless stream. Information and communication lines are gradually developing towards high density, optical fiber, area density, and routing complexity. With the rapid development of technology and network construction, the network After the construction is completed, the management of the network is relatively lagging behind, and the professional equipment is relatively independent. The company is not clear about the status of various resources it owns, especially lacks the grasp of the peripheral network resources and the lack of quick access to various data of the local network. The effective means and methods of the network, and the network mode of the whole network and the gradual improvement of system requirements have brought new challenges to our company to comprehensively provide combined services, and the control of its own network resources has gradually become the main obstacle restricting business development.
In addition, the existence of these problems has caused great difficulties to the operation and maintenance of the local network on the one hand, making the operation and maintenance costs remain high; on the other hand, it has also caused a large amount of idle and waste of network resources, affecting the further construction and planning of the network
When customers put forward business requirements, the response is often slow, and the service quality is difficult to satisfy customers. The combination of multiple services is scattered in various professional departments, and it takes a lot of time to go through the process between professional departments, which virtually affects the opening of the business, thus Affects the image of start-ups

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power information communication scheduling and monitoring platform
  • Electric power information communication scheduling and monitoring platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0019] Such as figure 1 As shown, an electric power information supervision platform includes, in sequence from the lower layer to the upper layer: a data collection analysis processing layer, a collaborative scheduling layer, and an application display layer;

[0020] The data acquisition, analysis and processing layer includes performance data acquisition module, alarm data acquisition module, security data acquisition module and configuration data acquisition module. Through each data acquisition module, all power system IT resource objects are analyzed according to the management strategy for o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an electric power information communication scheduling and monitoring platform which sequentially comprises a data acquisition analysis processing layer, a cooperation scheduling layer and an application display layer in the sequence from the lower layer to the upper layer. The data acquisition analysis processing layer collects operating state conditions, resource allocation data, asset data and safety data of all electric power system IT resource objects through all data acquisition modules according to a management strategy, classifies the data and transmits the data to the cooperation scheduling layer through data buses corresponding to all data types. The data acquisition analysis processing layer uploads the analyzed data to the cooperation scheduling layer, and the data are monitored through an operating monitoring module to find faults and automatically-given alarms or fault declaration and service requirements from clients to update the corresponding modules. The application display layer builds a unified image platform to enable the data of the cooperation scheduling layer and the data acquisition analysis processing layer to be displayed in an imaging mode. According to the electric power information communication scheduling and monitoring platform, real-time management and real-time monitoring on the IT resources are achieved, and the operating conditions are mastered in real time.

Description

technical field [0001] The invention belongs to the field of electric power system computer network, and in particular relates to an electric power information communication dispatching and monitoring platform. Background technique [0002] With the development of the company's network, the network capacity is becoming larger and larger, and new equipment emerges in an endless stream. Information and communication lines are gradually developing towards high density, optical fiber, area density, and routing complexity. With the rapid development of technology and network construction, the network After the construction is completed, the management of the network is relatively lagging behind, and the professional equipment is relatively independent. The company is not clear about the status of various resources it owns, especially lacks the grasp of the peripheral network resources and the lack of quick access to various data of the local network. The effective means and metho...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06
Inventor 刘树吉喻洪辉赵永彬李巍邓忠宇陈硕赵景宏杨壮观张诗茉于亮亮
Owner STATE GRID LIAONING ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products