A high-strength steel plate and production method technology, applied in the field of metal materials, can solve problems such as increased cost of steel plate alloys, high manufacturing costs, and complicated processes, and achieve the effects of loose process systems, low cost, and simple process routes
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2014-02-26
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of metal materials, in particular to a low-cost high-strength steel plate and a production method thereof. Background technique
[0002] With the development of the machinery industry and other construction industries, higher and higher requirements are put forward for steel materials. Generally, the steel materials used are required to have high comprehensive mechanical properties and good welding performance. High comprehensive mechanical properties can reduce the amount of materials used in equipment or buildings, and reduce the weight of the equipment itself; good welding performance can improve production efficiency and weldment quality.
[0003] Now the coal machinery industry and other construction industries are in great need of high-strength structural steel with a yield strength above 500MPa and good impact toughness and weldability. Therefore, how to economically and efficiently produce steel plates with a ...
Examples
Embodiment 1
[0049] The thickness of the continuous casting slab selected in Example 1 is 253mm.
[0050] During the heating process of the continuous casting slab, the temperature of the continuous casting slab out of the furnace was 1243° C., and the heating time was 373 minutes. The mass percentage of the chemical composition of the continuous casting slab includes: C0.09%, Si0.44%, Mn1.77%, P0.009%, S0.001%, Cr0.265%, Nb0.056%, V0. 059%%, Ti0.015%, Ca0.0013%, Als0.023%, the balance is Fe and unavoidable impurities.
[0051] Then the heated slab is subjected to the first-stage rolling and the second-stage rolling, and a steel plate with a thickness of 30 mm is obtained after the two-stage rolling processes are completed. Then the steel plate is cooled and heat treated, and the heat treatment time is 20 minutes.
[0052] Continuous casting slab heating, rolling, cooling and heat treatment process have little influence on the content of the chemical composition of the material of the st...
Embodiment 2
[0056] The thickness of the continuous casting slab selected in embodiment 2 is 252 mm.
[0057] During the heating process of the continuous casting slab, the temperature of the continuous casting slab out of the furnace is 1240° C., and the heating time is 370 minutes. The mass percentage of the chemical composition of the continuous casting slab includes: C0.086%, Si0.45%, Mn1.73%, P0.015%, S0.002%, Cr0.257%, Nb0.054%, V0. 058%, Ti0.014%, Ca0.0015%, Als0.023%, the balance is Fe and unavoidable impurities.
[0058] Then, the heated slab is subjected to the first-stage rolling and the second-stage rolling, and a steel plate with a thickness of 25 mm is obtained after the two-stage rolling processes are completed. Then the steel plate is cooled and heat treated, and the heat treatment time is 20 minutes.
[0059] The continuous casting slab heating, rolling, cooling and heat treatment processes have little influence on the chemical composition of the steel plate material, th...
Embodiment 3
[0063] The thickness of the continuous casting slab selected in embodiment 3 is 250mm.
[0064] During the heating process of the continuous casting slab, the temperature of the continuous casting slab coming out of the furnace is 1210° C., and the heating time is 250 minutes. The mass percentage of the chemical composition of the continuous casting slab includes: C0.08%, Si0.5%, Mn1.73%, P0.014%, S0.007%, Cr0.40%, Nb0.04%, V0. 062%, Ti0.02%, Ca0.001%, Als0.023%, the balance is Fe and unavoidable impurities.
[0065] Then the heated slab is subjected to the first-stage rolling and the second-stage rolling, and a steel plate with a thickness of 20 mm is obtained after the two-stage rolling processes are completed. Then the steel plate is cooled and heat treated, and the heat treatment time is 20 minutes.
[0066] Continuous casting slab heating, rolling, cooling and heat treatment process have little influence on the content of the chemical composition of the material of the ...