Distributing cable partial discharge test method based on oscillatory wave test
A partial discharge and power distribution cable technology, applied in the direction of testing dielectric strength, etc., can solve problems such as failure to detect discharge, rapid breakdown of insulation, cable damage, etc., to eliminate discharge interference, avoid cluttered discharge points, and increase testing. range effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The method for testing partial discharge of power distribution cables based on oscillating wave testing provided by the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0040] The method for testing partial discharge of power distribution cables based on oscillating wave testing provided by the present invention includes the following steps performed in sequence:
[0041] Step 1) Establish a test system: establish a cable partial discharge test and positioning system based on oscillatory wave testing;
[0042] Step 2) Test: use the above-mentioned cable partial discharge testing and positioning system to charge the cable by pressing the end of the cable under test to a preset value, and pass the inductance of the cable partial discharge testing and positioning system to the cable under test. The capacitor resonates and a damped oscillating voltage is generated at the end of the cable under test; ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 