Method for accurately calculating corrected electric quantity under wrong wiring of three-phase four-wire intelligent electric energy meter
A smart electric energy meter, wrong wiring technology, applied in the measurement of electrical variables, measuring devices, instruments, etc., can solve the problems of large errors in correct active power and corrected power, large errors in correction coefficients, and errors in calculation results, etc., to achieve correct active power and correcting the effect of accurate and huge guidance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Example 1: The wrong connection form is: voltage phase sequence U, V, W, and the current access method is , , , the load is known to be inductive. After the smart watt-hour meter has been running for a period of time, the power is read: the total reverse active power is 8.70kWh, the reactive power Ⅲ (reactive power in the Ⅲ quadrant) is 29.50kVarh, and the power shown in other displays is zero.
[0024] (1) According to the precise calculation method of the present invention, the calculation is as follows:
[0025] The power represented by the energy meter under this wrong wiring is:
[0026]
[0027]
[0028] Under symmetrical load
[0029]
[0030]
[0031]
[0032] ①
[0033]
[0034]
[0035] ②
[0036] Combine formulas ① and ② to get:
[0037]
[0038] but:
[0039]
[0040] Converted into electric quantity can get: ③
[0041] ④
[0042] Substitute the copied power into the formulas ③ and ④ (note that the reverse ...
Embodiment 2
[0065] The wiring form is the same as that of Example 1. The load is known to be capacitive. After running for a period of time, you can see the power: the reverse active power is 8.00kWh, the reactive power in the III quadrant is 5.40kVarh,
[0066]
[0067]
[0068]
[0069] W Q0 It is a negative value, indicating that it is capacitive reactive power, which is consistent with the actual situation.
[0070] The actual power value and average power factor (when the voltage phase sequence is U, V, W) under various wrong wiring conditions are shown in Table 1.