Excavation construction method of small foundation pit near excavated deep foundation pit

A construction method and technology for deep foundation pits, which are used in excavation, infrastructure engineering, construction, etc., can solve the problems of poor force on steel straight threaded joints, the main structure cannot be formed at one time, and the engineering cost is large, so as to save projects. The effect of cost, solving hidden dangers of waterproofing, and saving construction period

Active Publication Date: 2016-07-27
GUANGDONG CONSTR CO LTD OF CHINA RAILWAY NO 3 ENG GRP CO LTD +1
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The above traditional construction methods have the following disadvantages: (1), the construction of the main foundation pit is completed and then the small foundation pit is constructed, and there will be a large delay in the construction period; (2), the project cost is relatively large, and the management cost increases; (3) the main body The structure cannot be formed at one time. After the construction of the main structure of the main foundation pit is completed, the small foundation pit structure is constructed again, which is easy to damage the waterproof layer, and the straight threaded joint of the steel bar is not well stressed.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Excavation construction method of small foundation pit near excavated deep foundation pit
  • Excavation construction method of small foundation pit near excavated deep foundation pit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The idea, specific structure and technical effects of the present invention will be clearly and completely described below in conjunction with the embodiments and accompanying drawings, so as to fully understand the purpose, features and effects of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, rather than all of them. Based on the embodiments of the present invention, other embodiments obtained by those skilled in the art without creative efforts belong to The protection scope of the present invention. In addition, all the connection / connection relationships mentioned in this article do not refer to the direct connection of components, but mean that a better connection structure can be formed by adding or reducing connection accessories according to specific implementation conditions.

[0021] refer to Figure 1 ~ Figure 2 The illustrated embodiment one, a small foundation pit excavation construc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an excavation construction method of a small foundation pit near an excavated deep foundation pit. An excavation door is formed after a temporary pile, near the small foundation pit, at the bottom of the deep foundation pit is drilled off; soil in the small foundation pit is excavated through the excavation door, so that the soil in the small foundation pit falls down to the elevation of a waist beam support of the deep foundation pit; a corresponding waist beam support is constructed in the small foundation pit; a reinforcement in the corresponding waist beam support in the small foundation pit is connected with a reserved reinforcement of the corresponding waist beam support in the deep foundation pit; and the operation is circulated until the small foundation pit and the deep foundation pit are excavated to the corresponding elevations, so that the difficulty of incapability of synchronously constructing adjacent foundation pits is solved, the construction period is shortened, the projection cost is saved, the once formation of the main structure is guaranteed, the structure stress stability is guaranteed, and the waterproof hidden trouble of the main structure is solved. The safety in the excavation period of two foundation pits is guaranteed.

Description

technical field [0001] The invention relates to a foundation pit excavation in the field of building construction research, in particular to a small foundation pit excavation construction method adjacent to an excavated deep foundation pit. Background technique [0002] Due to the impact of traffic evacuation, pipeline relocation and other factors during the construction of the subway station in recent years, during the construction of the foundation pit, there will be some parts of the foundation pit that cannot be constructed, and only temporary isolation piles can be used to divide the foundation pit into two or even multiple foundation pits for construction. , the main foundation pit has been excavated and the support construction of each layer has been completed after the traffic evacuation or the pipeline problem is solved. According to the conventional construction method, the adjacent small foundation pit can only be excavated after the excavation of the main foundat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02
CPCE02D17/02
Inventor 孟涛曹建峰孙伯乐张延杰李云鹏王友林黄峰李国军耿少鹏崔建卜祯李俊锋苗永军岳康牛振峰
Owner GUANGDONG CONSTR CO LTD OF CHINA RAILWAY NO 3 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products