A Construction Method for Reinforcement Treatment of Soft Foundation Steel Pipe Pile in Confined Space
A technology of limited space and construction method, applied in infrastructure engineering, drilling equipment and methods, sheet pile wall, etc. problems such as the verticality of steel pipe piles to achieve the effect of light weight, small footprint and small length
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
[0031] A construction method for strengthening treatment of soft foundation steel pipe piles in a confined space, which includes the following steps:
[0032] Step (1) Assembly of drilling equipment: see figure 1 , Choose the full hydraulic eccentric drill anchoring rig 1 suitable for the hole diameter, prepare the corresponding number of steel casing 6 and casing shoes 3 according to the number of holes; use the eccentric drill bit 2, and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com