Construction Technology of Tunnel Open Tunnel Under the Complex Geological Environment
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology with complex geology and construction technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as mountain instability, construction interruption, and slope toe weakening, so as to prevent soil erosion, reduce mountain excavation, and land occupation The effect of less area
Inactive Publication Date: 2019-01-25
CHONGQING URBAN CONSTR HLDG GRP +1
View PDF6 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
However, bias pressure and complex geological conditions often exist in the location of the tunnel open hole. The open excavation construction will form a high cut slope, and the excavation of the foundation trench will weaken the slope toe, causing disasters such as landslides, collapses, and mountain instability, resulting in construction failures. In this case, it is imminent to design a construction process with obvious effects in speeding up the progress, protecting the environment, and ensuring safety.
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0032] The implementation of the present invention will be illustrated by specific specific examples below, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0033] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
[0034] like figure 1 - As shown in -4, a kind of construction technology of tunnel open hole under complex geological environment is carried out according to the following steps:
[0035] 1. Construction measurement
[0036] According to the steps of "retesting first and then controlling, first overall and then partial, and first controlling and then detailed", professional surveying engineers will be responsible for the surveying work, review the control pile points provided by the owner, and establish them outside the tunnel to be excavated after they are correct. Plane and elevation control ne...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention discloses a tunnel open-cut-tunnel underground-excavation construction technology under a complicated geologic environment. The tunnel open-cut-tunnel underground-excavation constructiontechnology comprises the following steps that first, surveying, setting-out and construction layout are conducted; second, water interception and drainage construction at the roof is conducted; third, a side and face upward slope is excavated and supported; fourth, a soil loose tooling is formed and constructed, specifically, when the side and face upward slope is excavated to get close to the elevation of the roof of an open-cut tunnel, large-range excavation is stopped, measuring staff set the lining axis and elevation of the open-cut tunnel on site, and earthwork stone on the two sides islongitudinally excavated along the axis of the open-cut tunnel through a reserved core soil method; fifth, cast-in-place concrete is conducted, specifically, an isolation layer is arranged on the outer surface of the formed soil loose tooling, and the isolation layer sequentially comprises a graded broken stone base with the thickness being 8 cm, a 1:3 cement mortar leveling layer with the thickness being 2 cm, and a color strip cloth interlayer from inside to outside; sixth, a protective arch of the open-cut tunnel is constructed; seventh, the open-cut tunnel is excavated and supported; and eighth, lining of the open-cut tunnel is conducted. According to the construction technology, landslide and collapse during tunnel excavation can be effectively prevented, the surrounding environment of a tunnel is protected, and construction is convenient, quick, safe and reliable.
Description
technical field [0001] The invention belongs to the technical field of tunnel excavation, and in particular relates to a tunnel excavation construction technology. Background technique [0002] In the construction of modern tunnels, most of the tunnel entrances have shallow buried depths, thin roof covering layers, and complex geological conditions. In order to facilitate early entry and ensure safety, open holes of a certain length are usually set at both ends of the tunnel entrance and exit. As the transition between the light and dark junctions of the tunnel, the open tunnel is an important part of the tunnel. It has the dual characteristics of ground and underground buildings. Its function is to connect the light and dark tunnels, resist the external forces of landslides and landslides, and support the stability of the slope. According to the construction principle of "early entry and late exit" of the tunnel, the construction of the open tunnel is the key to the entry a...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.