Cemented filling method of anti-corrosion silicon ash cementing materials in metal mine
A cementing material and cemented filling technology, which is applied in the direction of filling, mining equipment, earth square drilling, etc., can solve the problems that the corrosion process has not been fully clarified and the corrosion mechanism is complicated, so as to ensure long-term stability, ensure filling efficiency, reduce Probability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0026] 2) Preparation of anti-corrosion silica fume cementitious material: mix silica fume, cement, mineral powder, fly ash, gypsum and bauxite in a mixer to obtain anti-corrosion silica fume cementitious material;
[0027] 3) Preliminary mixing of filling slurry: mixing and stirring the graded tailings and the anti-corrosion silica fume cementitious material in a mixer to obtain a dry mixed slurry;
[0028] 4) Secondary stirring of the filling slurry: mixing and stirring the dry mix slurry and water in a secondary mixer to obtain the filling slurry;
[0029] 5) Filling: The filling slurry is self-flowed to the mining empty area through the filling pipeline. When the filling height of the slurry reaches the drainage and exhaust outlet, the drainage and exhaust pipeline is blocked, the slurry supply is stopped, and the filling pipeline is cut off.
[0030] Preferably, in step 1), the width of the retaining wall is >50cm.
[0031] Preferably, in step 1), the retaining wall is c...
Embodiment
[0044] 1. Preparation of filling site
[0045] Connect one end of the filling pipe to the outlet of the secondary mixer, and the other end to the mining vacancy to be filled along the mine shaft and mining passage, and place the outlet at the highest point of the mining vacancy; clean up the site and take out all useful items , and then build a wall with bricks and cement, build a pipe with a diameter of about 5cm on the top of the retaining wall for drainage and exhaust, and seal the opening of the mining empty area. The width of the retaining wall must be at least 50cm to prevent the wall If it collapses, put a layer of cement about 5cm thick on the wall to increase the impact resistance of the retaining wall and prevent water seepage.
[0046] 2. Preparation of silica fume cementitious material
[0047] Add 28 parts by quality of cement, 20 parts by quality of mineral powder, 15 parts by quality of fly ash, 18 parts by quality of silica fume, 7 parts by quality of gypsum a...
PUM
| Property | Measurement | Unit |
|---|---|---|
| width | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 