Open-cut single-layer double-or multi-hole tunnel split-framing and reverse-bracing construction method
A construction method and single-layer technology, applied in excavation, artificial islands, water conservancy projects, etc., can solve problems such as insufficient construction site, save construction period and cost, easily guarantee waterproof effect, and ensure construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] Embodiments of the present invention can be found in Figure 1 to Figure 14 shown.
[0044] The invention aims at double (multiple) hole single-layer underground road structure, and adopts open-cut and sequential construction method to construct underground road, and the structure does not carry out framing, and is constructed in stages, saving site space and engineering cost. Taking the double-hole structure as an example, the construction method and process arrangement are explained.
[0045] It can be seen from the figure that when excavating the side foundation pit of the rear excavation, the supporting structure of the middle row is "reversely" replaced from top to bottom, so that the water and soil pressure of the side wall of the rear excavation can be safely transmitted to the middle wall and the oblique throw At the support, the support structure of the middle row shall be demolished after it is safely unloaded. In each process, the foundation pit support sys...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com