51results about How to "Guarantee construction efficiency" patented technology

Reinforced concrete combination column structure and simultaneous pouring construction method

PendingCN106884502AIncreased shear strengthHigh structural construction efficiencyStrutsPillarsReinforced concreteArchitectural engineering
The invention relates to a reinforced concrete combination column structure which mainly comprises an upper steel tube column, a lower steel tube column, a lining tube, connecting ring plates and a vertical connecting screw; the upper steel tube column and the lower steel tube column are connected through the lining tube, concrete air vents and concrete pouring holes are formed in the surface of the steel tube columns, the connecting ring plates are arranged on the upper steel tube column and the lower steel tube column, the connecting ring plates are put on a cross-shaped rod and are anchored through horizontal screws on ring plate connecting end plates, and are horizontally clamped through U-shaped fastening brackets connected in series on the cross-shaped rod; the upper connecting ring plate and the lower connecting ring plate are connected through the vertical connecting screw, the vertical connecting screw and the upper connecting ring plate and the lower connecting ring plate are anchored by adopting screw caps, and a regulating and positioning top support is arranged on the end of the vertical connecting screw; and beam-column reinforcements are bound at the outer peripheries of the steel tube columns and templates are erected at the outer peripheries of the steel tube columns. According to the reinforced concrete combination column structure, the connecting node of the upper steel tube column and the lower steel tube column has strong anti-shearing performance, all members are simply and conveniently assembled, and the technical and economic benefits are prominent.
Owner:SHENZHEN FUTIAN JIANAN CONSTR GRP

Amplitude separation and reverse support replacement construction method for open-excavated single-layer twin-bore or multi-bore tunnel

ActiveCN108612128ASolving Safe Demolition IssuesReasonable process stress conversionArtificial islandsExcavationsStructure of the EarthMono layer
The invention discloses an amplitude separation and reverse support replacement construction method for an open-excavated single-layer twin-bore or multi-bore tunnel. For a twin-bore (multi-bore) single-layer underground road structure, the structure is free of amplitude separation, stage construction is carried out according to an open excavation and ordinal construction method and is completed in the manners of stage excavation of a foundation pit and stage implementation of the structure, the influence on current traffic is reduced, and the site space and project cost are reduced. A middle-row support structure is arranged at a stage excavation interface of the foundation pit, and reverse support replacement from top to bottom is carried out on the middle-row support structure when thefoundation pit is excavated in the later period, so that water and soil pressure of the outer side wall of the foundation pit excavated in the later period is safely transferred to a middle wall and aslant throwing support, and the middle-row support structure is removed after safe unloading is achieved. By means of the method, the technical problems of traffic reconciliation difficulties, site deficiency and the like during construction of underground roads under the condition of narrow sites in a city can be solved.
Owner:BEIJING GENERAL MUNICIPAL ENG DESIGN & RES INST

Building engineering quantity analysis and management method and system based on BIM technology, and computer storage medium

ActiveCN113343342APrecise optimization of construction periodImprove scienceGeometric CADForecasting3d imageConstruction engineering
The invention discloses a building engineering quantity analysis and management method and system based on a BIM technology, and a computer storage medium. The building engineering quantity analysis and management method based on the BIM technology comprises the following steps: constructing an original building engineering BIM model; carrying out model division on the original building engineering B I model; obtaining basic information corresponding to each original building sub-model; performing three-dimensional image acquisition on the constructed area of the constructional engineering; obtaining basic construction information corresponding to the constructed area of the building engineering; constructing a BIM model of the constructed area; matching and comparing the original building sub-models of the building engineering with the BIM model of the constructed area; optimizing the construction period corresponding to the to-be-constructed area of the building; therefore, the problem that the sharing, visualization and adjustability of the building engineering information cannot be realized by the existing building engineering quantity analysis and management method is effectively solved, and the smoothness of the building engineering construction process is greatly improved at the same time.
Owner:贵州百胜数源工程技术管理有限公司

Intelligent manufacturing method for LNG ship double-layer bottom subsections

The invention discloses an intelligent manufacturing method for LNG ship double-layer bottom subsections. The method specifically comprises the following steps: manufacturing an inner bottom plate middle assemblage, an outer plate secondary middle assemblage, a second longitudinal girder small assemblage, a first rib plate small assemblage, a third longitudinal girder small assemblage, a simple small assemblage, a second rib plate small assemblage and a longitudinal girder combined small assemblage; assembling the second rib plate small assemblage and the third longitudinal girder small assemblage together to generate a first longitudinal girder small assemblage; arranging a first small longitudinal girder assembly, a second small longitudinal girder assembly, a first small rib plate assembly, a simple small assembly and a small longitudinal girder assembly on the secondary middle assembly of the outer plate to form a middle assembly of the outer bottom plate; and folding the outer bottom plate middle assemblage and the inner bottom plate middle assemblage into a double-layer bottom subsection. According to the method, all intermediate products can be effectively managed, the turnover rate of a site can be increased, product overstock is reduced, and the construction quality and the construction efficiency of the double-layer bottom subsection are guaranteed.
Owner:HUDONG ZHONGHUA SHIPBUILDINGGROUP

Ship robot moving portal provided with gear meshing clearance elimination mechanism

The invention relates to the technical field of shipbuilding, and particularly discloses a ship robot moving portal provided with a gear meshing clearance elimination mechanism. The portal comprises two ground rails, first longitudinal traveling mechanisms, second longitudinal traveling mechanisms, a cross beam mechanism and a traveling trolley; the two ground rails are parallel with each other; the first longitudinal traveling mechanisms and the second longitudinal traveling mechanisms correspond to the two ground rails respectively; the two ends of the cross beam mechanism are fixedly connected with the first longitudinal traveling mechanisms and the second longitudinal traveling mechanisms respectively; a linear guiding rail is arranged on the cross beam mechanism; the traveling trolleyis arranged on the linear guiding rail; the first longitudinal traveling mechanisms and the second longitudinal traveling mechanisms are provided with bottom traveling drives; the bottom traveling drives are mounted through clearance elimination devices; each bottom traveling drive comprises a motor and a gear; racks are arranged on the ground rails and mesh with the gears; and the traveling trolley is provided with a cross beam traveling drive and moves along the linear guiding rail.
Owner:ZHONGCHUAN NO 9 DESIGN & RES INST

Trial paving device for stone paving and stone paving method

The invention discloses a trial paving device for stone paving and a stone paving method, and relates to the technical field of stone paving. The trial paving device can utilize a clamping mechanism to lift or release a template. The stone paving method comprises the steps of (1) placing a template on a bonding layer in a virtual paving state by using a clamping mechanism, and hammering the template so as to enable the bonding layer in the virtual paving state to be compacted and flattened by the template; (2) lifting the template by using the clamping mechanism, continuously paving a bondinglayer in a virtual paving state on the bonding layer compacted and flattened by the template, placing the template on a new bonding layer in the virtual paving state by using the clamping mechanism, and hammering the template so as to enable the new bonding layer in the virtual paving state to be compacted and flattened by the template; (3) repeating the step (2) until the thickness of the bondinglayer compacted and flattened by the template reaches the designed thickness of the bonding layer; and (4) hammering the stone on the bonding layer compacted and flattened by the template. Accordingto the invention, the labor intensity of constructors can be reduced, and the safety risk can also be reduced.
Owner:济南园林开发建设集团有限公司

Compaction machine for towed plum-blossom-shaped roller impact filling of soil and stone block wastes

PendingCN111172846AHigh leveling factorAchieving Towed Shock Operational EfficiencyRoads maintainenceSoil preservationGrindingAgricultural engineering
The invention discloses a compaction machine for towed plum-blossom-shaped roller impact filling of soil and stone block waste. The device structurally comprises a base, the device comprises a supporting column, a pressing oil cylinder, a lock catch clamping base, a lock shaft lifting and swinging device, a plum blossom grinding roller groove, a shaft cover cap and a linkage roller rod. Accordingto the invention, the lock shaft lifting and swinging device is matched with the plum-blossom-shaped grinding roller wheel groove; the towed plum blossom petal shell block is erected on the side of the lock shaft lifting and swinging device, and then the fan plate balancing weight and the stamping cylinder support are linked to form a cambered surface three-section type rolling effect. Three-station repeated compaction operation of filling and grinding is guaranteed by matching with inertia impact; the missing perfection after one-step compaction is improved; the construction efficiency and the fineness of plum blossom petal shell block rolling are ensured; the inner frame linkage roller rod of the compactor is matched with pressure injection of the stamping cylinder support to achieve theimpact filling effect of the soil and stone block waste, the integrity of a ground surface is improved, the bilateral sides of rolling are prevented from tilting, the overlaying hammering flatteningeffect is achieved, materials are saved for building filling of the foundation soil and stone block waste, and the foundation soil and stone block waste is fully used.
Owner:袁磊

Large-diameter cast-in-situ bored pile head overall breaking system and construction method

PendingCN113089671AReduce structural damageEnsure pouring qualityBulkheads/pilesRebarDrill hole
The invention belongs to the technical field of cast-in-situ pile construction. A large-diameter cast-in-situ bored pile head overall breaking system comprises a pile head separation support, isolation sleeves, a first counter-force frame, a second counter-force frame and a driving part, wherein the first counter-force frame and the second counter-force frame are correspondingly arranged up and down; the multiple isolation sleeves are arranged on the pile head separation support, longitudinal main ribs on the upper portion of a steel reinforcement cage of a cast-in-situ pile are arranged in the isolation sleeves in a matched and penetrating manner, and the pile head separation support and the isolation sleeves are poured on the top of the cast-in-situ pile; and a plurality of first counter-force holes are circumferentially distributed in a pile head of the cast-in-situ pile, a plurality of second counter-force holes are circumferentially distributed in the position, on the lower portion of the pile head separation support, of the cast-in-situ pile, and the first counter-force frame and the second counter-force frame are correspondingly arranged in the first counter-force holes and the second counter-force holes correspondingly. The invention further discloses a large-diameter cast-in-situ bored pile construction method. The large-diameter cast-in-situ bored pile head overall breaking system is reasonable in overall design, the problem existing in breaking of the pile head of the large-diameter cast-in-situ bored pile in the prior art can be solved, the breaking efficiency is improved, and the structural damage to a pile body is reduced.
Owner:HENAN HIGHWAY ENG GROUP +1

Tunnel monitoring equipment mounting trolley and using method thereof

The invention discloses a tunnel monitoring equipment mounting trolley and a using method thereof. The trolley comprises a walking mechanism, the walking mechanism comprises two walking bases arranged in a spaced mode and idler wheels arranged under the walking bases, the upper side of the walking mechanism is connected with a vertical telescopic mechanism, the vertical telescopic mechanism comprises four vertically-arranged hydraulic oil cylinders, and the upper side of the vertical telescopic mechanism is connected with a telescopic working platform. The telescopic working platform comprises a first platform plate and a second platform plate, and a third platform plate is slidably connected between the first platform plate and the second platform plate. The height and the width of the trolley can be conveniently adjusted, and the trolley can well adapt to the size of a rectangular tunnel; according to the tunnel monitoring equipment, passing of vehicles in the lower portion is not affected during operation, so that installation of the tunnel monitoring equipment gets rid of time limitation, installation can be carried out without waiting for specified maintenance time every week, high-strength installation does not need to be carried out at night, and the construction efficiency and safety of construction personnel are effectively guaranteed.
Owner:南京福欧地下空间数据科技有限公司 +2

Semantic description method for simulation service based on body

The invention relates to a semantic description method for a simulation service based on a body. The invention discloses a simulation service resource modeling method oriented to networking simulation. A prototype system for the method mainly comprises a resource service modeling description module, a functional service modeling description module and an application-oriented networking simulation service modeling description module. The semantic description method comprises the concrete implementation steps: performing attribute description on various modeling simulation resources in a networking simulation platform by the resource service modeling description module; describing a functional service attribute, an interface and a service process by the functional service modeling description module; performing the static contact and dynamic logic modeling description on the networking simulation service on the basis of the networking simulation service modeling description module. According to the semantic description method, the modeling description problem of various simulation service resources characterized by different granularity, isomerism, distribution, and the like, in engineering application is solved, and the effectiveness and the reusability of various simulation service resource descriptions in networking simulation engineering application are ensured.
Owner:BEIJING SIMULATION CENT

Anti-water-locking easily-dissolved alcohol-based fracturing fluid and preparation method thereof

The invention discloses an alcohol-based fracturing fluid capable of preventing water locking and easy to dissolve and a preparation method of the alcohol-based fracturing fluid, overcomes the defects that a conventional emulsion thickening agent system fracturing fluid is poor in high-temperature resistance and high-salt resistance, and also overcomes the defects that a conventional powder thickening agent fracturing fluid system is slow in dissolution and cannot be continuously mixed for construction. According to the specific technical scheme, the method comprises the following steps: adding the suspension stabilizer into the waterproof locking agent, performing stirring until the suspension stabilizer is completely dissolved, then adding the phase inversion agent, performing uniform mixing to prepare a suspension base solution, then adding the defoaming agent and the main agent polyacrylamide polymer powder into the suspension base solution, and performing uniform stirring at a high speed to obtain the waterproof locking alcohol group fracturing fluid. The preparation process is simple and rapid, and the quick-dissolving fracturing fluid is instant, does not need to be prepared in advance, is suitable for large-scale on-site fracturing, has the properties of temperature resistance, salt resistance and easiness in flowback, and can meet the fracturing construction requirements of tight gas reservoirs with low porosity, low permeability, high water saturation and the like.
Owner:SHAANXI UNIV OF SCI & TECH

A bridge foundation construction method for old city reconstruction

The invention provides a bridge foundation construction method for old city reconstruction, comprising the following steps: S1, earthwork excavation, hoisting, excavating the pile foundation space for embedding the bridge foundation on the ground of the old city, and placing the earthwork It was hoisted from the inside to the outside. Due to the anchor cable buried under the old city, the earthwork could not be lifted normally. During the excavation of the pile foundation, an additional person fastened the safety belt and stood at the position of the anchor cable to hold the earthwork containing the earthwork. frame, to assist in lifting out the excavated earth and stone, and let the earth frame pass through the side of the anchor cable until the earth and stone are lifted smoothly; S2, install a steel casing, divide a rigid casing into multiple pieces, and assemble them in the pile hole to avoid Open the impact on the anchor cable in the pile; S3, install the reinforcement cage; S4, pour concrete pile foundation, in the case of existing houses around the high slope, when building the foundation of the highway bridge, this application can solve the problem of retaining wall anchor cable and retaining wall The technical problem of the collision between the wall lattice beam and the pile foundation ensures the construction efficiency and construction quality of the bridge foundation.
Owner:重庆共联建筑工程(集团)有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products