A BIM technology-based construction engineering quantity analysis management method, system and computer storage medium

A technology of construction engineering and management methods, applied in the direction of calculation, data processing application, design optimization/simulation, etc., can solve the problem that the construction period cannot be accurately optimized, and the construction cost cannot be effectively improved. Process smoothness, inability to realize information sharing, visualization and adjustment of construction engineering, etc., to achieve the effect of improving scientificity and fit, improving convenience, and ensuring construction efficiency

Active Publication Date: 2022-02-15
贵州百胜数源工程技术管理有限公司
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The analysis and management of the existing construction quantity is mainly based on the analysis and management of the construction quality of the construction process of each sub-project of the construction project, and the content of the analysis and management is scattered, and the construction information corresponding to each sub-project has an island effect. It can be seen that the existing analysis and management methods of construction engineering quantities still have certain disadvantages. On the one hand, the existing analysis and management methods of construction engineering quantities cannot realize the sharing, visualization and adjustment of construction engineering information. On the one hand, the existing analysis and management methods of construction engineering quantities cannot achieve precise optimization of the construction period of construction projects; on the other hand, the existing analysis and management methods of construction engineering quantities cannot effectively improve the scientific cost of construction projects Sex and fit and the smoothness of the building construction process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A BIM technology-based construction engineering quantity analysis management method, system and computer storage medium
  • A BIM technology-based construction engineering quantity analysis management method, system and computer storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The following will be implemented in conjunction with the present invention. The above content is only an example and description of the concept of the present invention. Those skilled in the art will make various modifications or supplements to the described specific embodiments or replace them in similar ways. As long as it does not deviate from the concept of the invention or exceeds the scope defined in the claims, it shall belong to the protection scope of the present invention.

[0033] see figure 1 As shown, the first aspect of the present invention provides a method for analyzing and managing construction quantities based on BIM technology, the method comprising the following steps:

[0034] S1. Architectural model construction: construct the BIM model through the model building module, and then import the design drawing corresponding to the construction project, obtain the BIM model corresponding to the construction project according to the design drawing corre...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention discloses a BIM technology-based construction engineering quantity analysis management method, system and computer storage medium. The BIM technology-based construction quantity analysis management method includes: constructing the BIM model of the original construction project; performing model division on the BIM model of the original construction project; obtaining basic information corresponding to each original construction sub-model; Three-dimensional image acquisition; obtain the basic construction information corresponding to the construction area of ​​the construction project; construct the B I M model of the construction area; match and compare the original building sub-models of the construction project with the B M model of the construction area; The corresponding construction period is optimized; thus effectively solving the problem that the existing analysis and management methods of construction engineering quantity cannot realize the sharing, visualization and adjustment of construction engineering information, and also greatly improving the construction engineering construction. smoothness of the process.

Description

technical field [0001] The invention belongs to the technical field of engineering quantity analysis and management, and relates to a BIM technology-based construction engineering quantity analysis and management method, system and computer storage medium. Background technique [0002] The analysis and management of construction project quantity is an important basis for construction project cost and construction project construction. Therefore, in order to ensure the scientificity and fit of construction project cost and the smoothness of construction process, it is necessary to analyze the construction project quantity and management. [0003] The analysis and management of the existing construction quantity is mainly based on the analysis and management of the construction quality of the construction process of each sub-project of the construction project, and the content of the analysis and management is scattered, and the construction information corresponding to each s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06F30/13G06F30/20G06Q10/04G06Q10/06G06Q10/10G06Q50/08
CPCG06F30/13G06F30/20G06Q10/04G06Q10/06395G06Q10/103G06Q50/08
Inventor 郭魁
Owner 贵州百胜数源工程技术管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products