Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building engineering quantity analysis and management method and system based on BIM technology, and computer storage medium

A technology of construction engineering and management methods, applied in the directions of calculation, data processing application, design optimization/simulation, etc., can solve the problem of inability to accurately optimize the construction period of construction projects, and effectively improve the scientific and fit construction of construction engineering costs The smoothness of the process, the inability to realize the sharing, visualization and adjustment of construction engineering information, etc., to achieve the effect of improving scientificity and fit, improving convenience, and ensuring construction efficiency

Active Publication Date: 2021-09-03
贵州百胜数源工程技术管理有限公司
View PDF10 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The analysis and management of the existing construction quantity is mainly based on the analysis and management of the construction quality of the construction process of each sub-project of the construction project, and the content of the analysis and management is scattered, and the construction information corresponding to each sub-project has an island effect. It can be seen that the existing analysis and management methods of construction engineering quantities still have certain disadvantages. On the one hand, the existing analysis and management methods of construction engineering quantities cannot realize the sharing, visualization and adjustment of construction engineering information. On the one hand, the existing analysis and management methods of construction engineering quantities cannot achieve precise optimization of the construction period of construction projects; on the other hand, the existing analysis and management methods of construction engineering quantities cannot effectively improve the scientific cost of construction projects Sex and fit and the smoothness of the building construction process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building engineering quantity analysis and management method and system based on BIM technology, and computer storage medium
  • Building engineering quantity analysis and management method and system based on BIM technology, and computer storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The above will be described below with reference to the embodiments of the present invention, and those skilled in the present invention, those skilled in the art will do a wide variety of modifications or supplements or use in a similar manner, in a similar manner. It should belong to the scope of the present invention as long as it is not deviating from the inventive concept or surpassing the scope defined by the following.

[0033] See figure 1 As shown in the first aspect of the invention, the first aspect of the invention provides a BIM-based construction engineering analysis management method, which includes the following steps:

[0034] S1, Building Model Construction: BIM model constructs through the model build module, and introduces the design drawing of the building project, obtain the BIM model corresponding to the building project according to the design of the building, and the building project corresponding to the building project Model records the BIM model ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building engineering quantity analysis and management method and system based on a BIM technology, and a computer storage medium. The building engineering quantity analysis and management method based on the BIM technology comprises the following steps: constructing an original building engineering BIM model; carrying out model division on the original building engineering B I model; obtaining basic information corresponding to each original building sub-model; performing three-dimensional image acquisition on the constructed area of the constructional engineering; obtaining basic construction information corresponding to the constructed area of the building engineering; constructing a BIM model of the constructed area; matching and comparing the original building sub-models of the building engineering with the BIM model of the constructed area; optimizing the construction period corresponding to the to-be-constructed area of the building; therefore, the problem that the sharing, visualization and adjustability of the building engineering information cannot be realized by the existing building engineering quantity analysis and management method is effectively solved, and the smoothness of the building engineering construction process is greatly improved at the same time.

Description

Technical field [0001] The present invention belongs to the field of engineering analysis management, involving a BIM technology-based construction engineering analysis management method, system, and computer storage medium. Background technique [0002] Analysis and management of construction engineering is an important foundation for construction project costs and construction projects. Therefore, in order to ensure the scientific and fitness of construction project costs and the smoothness of construction process, the engineering volume of construction projects is needed. And manage. [0003] The analysis and management of existing construction projects is based on the analysis and management of construction quality of construction processes for construction projects, and the content of analysis and management has dispersion, and the construction information corresponding to each sub-project has an island effect. It can be seen that the analysis and management method of the ex...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/20G06Q10/04G06Q10/06G06Q10/10G06Q50/08
CPCG06F30/13G06F30/20G06Q10/04G06Q10/06395G06Q10/103G06Q50/08
Inventor 郭魁
Owner 贵州百胜数源工程技术管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products