Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

8results about How to "Reduce construction accidents" patented technology

Pneumatic mechanical anchor bolt sleeve knocking mechanism

ActiveCN222644483UImprove efficiencyReduce construction accidentsPortable percussive toolsAnchor bolt
The utility model relates to the technical field of mechanical anchor bolts, and discloses a pneumatic mechanical anchor bolt sleeve knocking mechanism which comprises a pneumatic knocking mechanism body, a pushing mechanism is arranged outside the pneumatic knocking mechanism body, the pneumatic knocking mechanism body comprises an air inlet connector, and a rear end cover is installed on the inner side of the air inlet connector. A knocking core is fixedly connected to the top of the rear end cover, a knocking sleeve is installed outside the knocking core, an anti-disengaging spring is fixedly connected to the top of the knocking sleeve, a knocking head is fixedly connected to the top of the knocking sleeve, a rear fixing base is fixedly connected to the bottom of the air inlet connector, and a front fixing base is connected to the outside of the knocking sleeve in a sleeving mode. According to the pneumatic mechanical anchor bolt sleeve knocking mechanism, the anchor bolt sleeve is clamped in a concrete hole through the pneumatic knocking mechanism, the operation of knocking and installing the anchor bolt sleeve is completed, and the effects that automatic operation is achieved, manual operation is replaced to execute high-altitude bolt planting operation, efficiency is improved, and construction accidents are reduced are achieved.
Owner:ZHEJIANG ZHIJI CLOUD TECH CO LTD

Urban underground pipeline three-dimensional visualization method capable of enhancing virtual-real fusion

According to the augmented reality fusion urban underground pipeline three-dimensional visualization method, calculation of internal and external parameters of a camera in an augmented reality fusion system and a three-dimensional tracking registration scheme of the augmented reality fusion system are provided, an underground pipeline visualization system based on augmented reality is constructed, virtual underground pipelines are directly displayed on a construction site scene in an overlapping mode, and the construction efficiency is improved. And fusion of the virtual pipeline and the real scene is realized. A user can correspond a construction site to spatial position information, such as position and depth, of the urban three-dimensional underground pipeline, the depth information of the pipeline in a real environment can be clearly sensed while a virtual-real superposition effect is obtained, and the understanding of the user to the pipeline and the surrounding environment is improved; in addition, the enhanced virtual-real fusion system can interact with a user, so that on-site constructors can understand information such as spatial distribution and shielding relation of underground pipelines, and meanwhile, the user can query various data such as attribution, flow and production places of the pipelines and real images of the pipelines.
Owner:周林初

A new secondary structure corner horn mouth

ActiveCN117661836BAvoid exposed steel barsRealize turnover utilizationArchitectural engineeringHouse building
The present application relates to the technical field of house building, and especially to a new secondary structure corner horn, which comprises a wall, a main and secondary beam, a construction column template, a funnel pouring opening, a receiving box and a plurality of opposite pull bolts, the construction column template is connected with the wall through the opposite pull bolts, the top of the funnel pouring opening is overlapped on the bottom of the main and secondary beam, a through slot is formed in one side of the construction column template, and a closable opening is formed in one side and the bottom of the funnel pouring opening. The pouring concrete enters the inside of the construction column template through the closable opening in one side of the funnel pouring opening, and the construction column is built. When the position of the construction column is located at the joint position of the main and secondary beam, the funnel pouring opening does not need to be lowered, which is beneficial to avoid the exposure of the construction column reinforcement, and the concrete excess material is discharged from the closable opening in the bottom template, so that the effect of recycling the concrete excess material in the horn is achieved.
Owner:THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV

Shale reservoir formation pore pressure logging prediction method based on improved bowers equation

ActiveCN120906540BImprove forecast accuracyAccurate formation pore pressure data
The present application relates to a shale reservoir formation pore pressure logging prediction method based on improved Bowers equation, comprising: combining Bowers equation, establishing a sound wave velocity response equation considering the influence of density and organic matter content; soaking experiment is carried out on rock sample, and based on acoustic travel time, density, deep and shallow resistivity in logging data, the formation acoustic velocity and density corrected by hydration are obtained; based on the sound wave velocity and density of the original formation corrected by hydration, the Bowers equation of the research formation is obtained; the Bowers equation of the research formation is modified to obtain the improved Bowers equation of the research formation; based on the improved Bowers equation, the formation effective stress and vertical stress are calculated; based on the formation effective stress and vertical stress, the formation pore pressure of the research formation is calculated. The modified Bowers formation pore pressure prediction model established in the present application has obviously improved prediction accuracy, which is beneficial to reduce the occurrence of construction accidents and reduce the development cost.
Owner:SOUTHWEST PETROLEUM UNIV

Perforating device for house building construction

The utility model discloses a punching device for house building construction. The punching device comprises a power assembly, a positioning assembly, a fixing assembly and a drill rod. The fixed end of the drill rod is detachably connected with the fixing assembly, the fixing assembly is used for clamping and fixing the fixed end of the drill rod, and the fixing assembly is further fixed to the power output end of the power assembly so as to drive the drill rod to rotate. The power assembly is detachably arranged on the positioning assembly, the positioning assembly is used for abutting against a to-be-punched face to be punched for positioning, and meanwhile the positioning assembly is further used for guiding and limiting the power assembly in the punching pushing direction so that the drill rod can vertically drill the to-be-punched face. According to the device, it can be ensured that the drill rod is always kept in the state of being perpendicular to the face to be punched in the punching process, the problem that punching is inaccurate due to the fact that the drill rod deviates or inclines in the drilling and beating process is solved, meanwhile, the drill rod is detachably connected with the fixing assembly so that the drill rod can be rapidly disassembled and replaced, then the downtime is shortened, and the production efficiency is improved. And the overall construction efficiency and the construction flexibility are improved.
Owner:HUNAN THIRD ENG CO LTD

A device for straightening poles used in power grid construction

This invention discloses a pole straightening device for power grid erection, applicable in the field of power equipment erection. The key technical features are: the lifting mechanism includes a lifting auxiliary component and bearings; a limit groove is provided on the left side of the lifting auxiliary component; a drive motor is installed at the top of the lifting auxiliary component; and the output end of the drive motor passes through the top of the lifting auxiliary component and is fixedly connected to a threaded rod via a coupling. The technical advantages are: by movably connecting the outer wall of the round rod to the U-shaped block, firstly, during the clamping process of the erection pole, it is convenient to place two semi-circular parts on the outer wall of the erection pole for clamping; secondly, as the U-shaped block rises under the action of the lifting block, the erection pole can also rotate around the round rod under the influence of gravity. With the cooperation of the lifting mechanism and the clamping mechanism, not only is straightening achieved, but the clamping effect is also more stable, less prone to swaying and shaking, greatly reducing the risk of slippage, minimizing construction accidents, and ensuring high safety.
Owner:STATE GRID SHANDONG ELECTRIC POWER CO FEIXIAN POWER SUPPLY CO

Pneumatic mechanical anchor bolt planting mechanism

The utility model relates to the technical field of pneumatic mechanical anchor bolts, and discloses a pneumatic mechanical anchor bolt planting mechanism which comprises a height adjusting mechanism, an anchor bolt planting mechanism is arranged at one end of the height adjusting mechanism, the height adjusting mechanism comprises a height adjusting air cylinder, the top of the height adjusting air cylinder is fixedly connected with a first base, and the first base is fixedly connected with a second base. The pneumatic mechanical anchor bolt planting mechanism comprises a first base, a first guide rail is fixedly connected to the inner side of the first base, an operation air cylinder is fixedly connected to the top of the first base, a second base is fixedly connected to the top of the operation air cylinder, a second guide rail is fixedly connected to the inner side of the second base, and an auxiliary air cylinder is fixedly connected to the top of the second base. And through the height adjusting mechanism, the lifting is more stable and accurate when the mechanical anchor bolt is installed at a high position in a layer-by-layer progressive lifting mode, and the effects that automatic operation is achieved, manual execution of high-altitude bolt planting operation is replaced, efficiency is improved, and construction accidents are reduced are achieved.
Owner:ZHEJIANG ZHIJI CLOUD TECH CO LTD