Building construction safety early warning protection system based on BIM

A safety early warning and protection system technology, applied to alarms, instruments, etc., can solve problems affecting the personal safety of construction workers, forgetting to wear helmets, and falling objects from heights

Active Publication Date: 2020-10-16
NANTONG DAXIN ENG
View PDF10 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] With the rapid development of the information age, the safety of building construction has also been transformed into information data for calculation and storage. The existing BIM building construction can only design and construct building models, but cannot guarantee the personal safety of construction personnel. , has the following disadvantages:
[0004] 1. During the construction process, the wearing of safety helmets for construction workers can only be worn by manual reminders. It is easy for construction workers not to wear safety helmets or forget to wear safety helmets, which will affect the personal safety of construction workers;
[0005] 2. In the process of building construction, falling objects are prone to occur, which seriously endangers the personal safety of construction workers, and the personal safety of construction workers cannot be guaranteed;

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction safety early warning protection system based on BIM
  • Building construction safety early warning protection system based on BIM
  • Building construction safety early warning protection system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0100] Embodiment 1: After the two-dimensional model building unit establishes the two-dimensional model of the construction site, the coordinate value assignment unit takes a top angle of the two-dimensional model as the center to establish a plane Cartesian coordinate system, so that the entire two-dimensional model is located at the center of the plane Cartesian coordinate system. In the first quadrant, the coordinate values ​​assigned by the coordinate value assigning unit to the two-dimensional model are all positive, which is convenient for later analysis and calculation. The dangerous area division unit divides the dangerous areas in the two-dimensional model, and the coordinate value assigning unit assigns each The coordinate values ​​of the top corners are (10,10), (10,60), (60,10), (60,60);

[0101] The coordinate value assigning unit performs real-time positioning on the position of the construction personnel in the plane Cartesian coordinate system. The real-time po...

Embodiment 2

[0118] Embodiment two: the tower crane trajectory input unit is based on the two-dimensional model after the establishment and the plane Cartesian coordinate system, and inputs the trajectory coordinates in the tower crane operation process to form the tower crane operation trajectory coordinate value set Q={(M 1 , N 1 ),(M 2 , N 2 ),(M 3 , N 3 ),…,(M q , N q )}, where, q means that t is the time unit in the running track of the tower crane, and q coordinate values ​​have been experienced, and the dangerous area division unit is based on the coordinate value of the running track of the tower crane (M i , N i ) as the center of the circle, and R as the radius, establish the dangerous area on the running track of the tower crane, and the radius R is determined according to the following formula:

[0119]

[0120] Wherein, R=3 represents the distance between two adjacent coordinate values.

[0121] Tower crane construction time unit input tower crane construction time ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building construction safety early warning protection system based on BIM, and belongs to the technical field of BIM building construction. An information input module is used for inputting various data information on a construction site into the system. A model establishing module is used for establishing a construction site model. A central control module is used for intelligently controlling the whole system. An analysis and early warning module is used for establishing a construction site model, and analyzing various dangerous behaviors in the construction process. According to the invention, a two-dimensional model and a rectangular plane coordinate system are established, according to a dangerous area dividing unit and a travel track prediction unit, the prediction of the advancing track of the construction personnel is effectively realized. Whether a constructor enters a dangerous area or not is judged according to the predicted advancing track, the face information of the constructor capable of entering the dangerous area for construction is determined according to the face recognition and face information input unit, irrelevant personnel can be effectively prevented from entering the dangerous area, and the personal safety of the constructor can be effectively guaranteed.

Description

technical field [0001] The invention relates to the technical field of BIM building construction, in particular to a BIM-based building construction safety early warning and protection system. Background technique [0002] Building Information Modeling is a new tool in architecture, engineering and civil engineering. It is used to describe those computer-aided designs that are based on three-dimensional graphics, object-oriented, and related to architecture; [0003] With the rapid development of the information age, the safety of building construction has also been transformed into information data for calculation and storage. The existing BIM building construction can only design and construct building models, but cannot guarantee the personal safety of construction workers. , has the following disadvantages: [0004] 1. During the construction process, the wearing of safety helmets for construction workers can only be worn by manual reminders. It is easy for construction...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G08B21/02
CPCG08B21/02
Inventor 王邦国王赛陆良兵顾金山时红翔
Owner NANTONG DAXIN ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products