D-BIM method applied to building construction and operation maintaining comprehensive management

A D-BIM and building construction technology, applied in special data processing applications, geometric CAD, electrical digital data processing, etc., can solve the problems of not having time-varying characteristics, unable to reflect the time-varying characteristics of construction projects, etc., to reduce potential safety hazards Effect

Inactive Publication Date: 2018-08-03
NANTONG SIJIAN CONSTR GRP
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in building construction, the spatial, physical, and chemical processes of the structure all have time-varying characteristics, and the existing BIM model is a combination of static VR (virtual reality) and management database, which cannot reflect the time-varying characteristics of construction projects.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0052] ① The construction party formulates the construction plan according to the construction drawings, and establishes the BIM model of the climbing frame according to the site conditions, and conducts secondary development on the basis of BIM to form a D-BIM dynamic monitoring system;

[0053] ② Through the secondary development of BIM, establish a D-BIM data exchange center (database) for various spatial and mechanical characteristics of climbing frame construction;

[0054] ③ Use the space monitoring system arranged on site to monitor the time-varying space characteristics during the construction of the climbing frame, and transmit the measured data to the database in real time;

[0055] ④The D-BIM master control platform transmits data, establishes a finite element analysis model, analyzes the force characteristics during the construction process and maintenance period of the climbing frame, and performs precision control and safety warning for the lifting process of the ...

Embodiment 2

[0059] According to the building structure and electrical equipment layout, establish a BIM model, conduct secondary development on the basis of BIM, and establish an intelligent monitoring system for building equipment;

[0060] ② Establish intelligent D-BIM monitoring system for building equipment, integrate dynamic monitoring method based on intelligent D-BIM of building equipment, precision control and safety early warning method based on intelligent D-BIM of building equipment, intelligent D-BIM based The automatic control method and the intelligent general control platform of building equipment can monitor the operation status of building electrical equipment;

[0061] ③ Through the secondary development of BIM, a database for building dynamic monitoring is established;

[0062] ④ The building equipment intelligent D-BIM master control platform transmits data, and connects the building equipment intelligent monitoring system with the BIM model through the mapping mecha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a D-BIM method applied to building construction, operation and maintaining management. The D-BIM method applied to building construction, operation and maintaining management includes the steps that (1) according to the building construction scheme, BIM solid modeling is carried out, secondary development is carried out on the basis of a BIM, and a D-BIM dynamic monitoringsystem is formed; (2) through the D-BIM dynamic monitoring system, a dynamic monitoring method based on the D-BIM, an accuracy control and security early warning method based on the D-BIM, a self-control method based on the D-BIM and a D-BIM total control platform based on the D-BIM are integrated; (3) a building construction dynamic monitoring database with building dynamic monitoring space, mechanics and durability characteristics and device running conditions are established; (4) a structural-mechanics and durability-time-varying finite element model is established, and the mechanics and durability characteristics of structures of the construction process and later operation and maintenance stages are analyzed; (5) through the D-BIM total control platform, running conditions of variousdevices at the construction and operation stages are collected and controlled. By means of the D-BIM method applied to building construction and operation maintaining management, accuracy control andsecurity early warning of the construction process can be carried out in time, hidden danger is reduced, and construction efficiency is improved.

Description

technical field [0001] The invention relates to a BIM method in the fields of civil engineering information management and automatic control, and in particular to a dynamic D-BIM method applied to comprehensive management of building construction, operation and maintenance. Background technique [0002] BIM is an indispensable platform for the design, construction and maintenance information management of civil engineering, water conservancy engineering and other industries. For example, the design unit establishes a BIM model, which is convenient for the owner to intuitively understand the main features of the building, and finds defects in the design so that they can be corrected in time; the construction unit can visually display and analyze the key points and difficulties of construction in the technical bid with the help of BIM modeling For buildings with relatively simple structures, the engineering quantity can also be directly calculated through the BIM model; for co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
CPCG06F30/13G06F30/23
Inventor 耿裕华徐卓许笑旻曹林杰
Owner NANTONG SIJIAN CONSTR GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products