Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

251results about How to "Guaranteed normal passage" patented technology

Municipal road indicating equipment for sponge city

The invention discloses municipal road indicating equipment for the sponge city. The municipal road indicating equipment for the sponge city comprises a support pillar, wherein an indicator plate is fixedly connected to the side wall of the support pillar; a dust prevention mechanism is arranged on the side wall of the indicator plate and comprises an installation box; the installation box is fixedly connected to the side wall of one end, far away from the support pillar, of the indicator plate; openings communicating with the outside are formed in the front side wall and the back side wall ofthe installation box; an installation rod is fixedly connected to the inner wall, close to the bottom end, of the installation box; a rubber barrel is fixedly connected to the upper wall of the installation rod; a tuning fork is fixedly connected into the rubber barrel; furs are fixedly connected to the side wall of the tuning fork; multiple ventilation holes are formed in the side wall of one end, far away from the indicator plate, of the installation box; and a reciprocating screw rod is rotatably connected to the upper wall of the installation rod through a bearing. According to the municipal road indicating equipment for the sponge city provided by the invention, the amount of dust attached to the side wall of the indicator plate can be greatly reduced, and the indicator plate can beautomatically cleaned, so that time and effort are greatly saved, and the personal safety of people and the normal passage of traffic are further ensured.
Owner:扬州市路安新型材料有限公司

Tunnel inverted-arch self-propelled trestle

The invention provides a tunnel inverted-arch self-propelled trestle. Walking supports and horizontal moving oil cylinders are arranged below a trestle body, inverted-arch side formworks are arranged on the two sides of the trestle body, and thus the trestle can move front, back, left and right. When a construction vehicle walks to a construction road section through the trestle, concrete is poured, and inverted-arch work is started through the inverted-arch side formworks. A rear approach bridge is arranged behind the trestle body, a driving wheel is arranged below the rear end of the trestle body, the walking supports are arranged below the trestle body, a front approach bridge is arranged in front of the trestle body, a front trestle brace is arranged below the front approach bridge, the integral horizontal moving oil cylinders are arranged below the front end of the trestle body, foot margin oil cylinders are arranged below the integral horizontal moving oil cylinders, side formwork systems are arranged on the two sides of the trestle body, and formwork horizontal moving oil cylinders are arranged above the side formwork systems. The tunnel inverted-arch self-propelled trestle is simple in structure and low in cost and fault rate, inverted-arch construction can be carried out while vehicle traffic is ensured, the tunnel building speed can be effectively ensured, and building accidents are effectively reduced.
Owner:黄高飞 +1

Supporting device for frame structure

The invention discloses a supporting device for a frame structure. The supporting device for the frame structure comprises frame columns, a frame beam, fixing hinge supports, upper supporting rods, shaft pins (a), shaft pins (b), shaft pins (c), lower support rods, snap rings, sliding blocks, chutes, sleeves and an air hoist, wherein the frame beam is arranged on the frame columns in a lapped manner; the fixed hinge supports are positioned at the midspan position of the frame beam and are connected with the upper supporting rods through the shaft pins (a); the upper supporting rods are connected with the lower supporting rods through the shaft pins (b); each lower supporting rod is provided with the corresponding snap ring and is connected with the corresponding sliding block through the corresponding shaft pin (c); each sliding block slides in the corresponding chute; the chutes are positioned in the frame columns; the sleeves are sleeved on the upper supporting rod; and hooks of the air hoist hook the upper supporting rods. The supporting device for the frame structure has the advantages that the supporting device is folded at ordinary times, and usage of space of a building is not affected; the supporting device is unfolded in urgent conditions or in a sudden disaster, the structure rigidity is improved, and a building structure has quite high anti-seismic and shock-resistant abilities in a short time.
Owner:HUNAN UNIV

Construction device for in-situ maintenance or extension of highway tunnel

The invention relates to a construction device for in-situ maintenance or extension of a highway tunnel. The construction device comprises a steel protective cover for the in-situ maintenance or the extension of the tunnel. The construction device is characterized in that the steel protective cover is commonly composed of portal frames, a skin covered steel plate and a slide groove; a plurality of the portal frames are arrayed along the longitudinal direction to form a framework of the steel protective cover; the skin covered steel plate is connected with an outer side flange plate of each frame by a skin covered steel plate bolt so as to form a closed inner space; traffic vehicles can pass in the closed space and construction machines can walk above the steel protective cover to carry out various types of maintenance work on tunnel linings; the slide groove is fixedly arranged on a previous road surface by an anchor bolt and each portal frame is connected into the slide groove by the bolt; and the slide groove provides a support pressure to the steel protective cover and also provides guiding orientation on the movement of the steel protective cover. According to the construction device for the in-situ maintenance or the extension of the highway tunnel, a traffic pressure caused by closed traffic controls is greatly relieved, and the adverse effects to public benefits and social benefits, caused by maintenance or extension engineering, are reduced greatly.
Owner:FUZHOU UNIV

Ship with adjustable ship squat and adjustable ship width

ActiveCN104290858AAdjustable widthRealize free navigation in multiple watersHull interior subdivisionVessel safetyMarine engineering
The invention discloses a ship with an adjustable ship squat and an adjustable ship width. The ship comprises a ship body. The two sides of the ship body are each provided with ship width adjusting mechanisms and squat adjusting mechanisms, wherein the ship width adjusting mechanisms are used for changing the ship width, and the squat adjusting mechanisms are used for changing the ship squat. Each ship width adjusting mechanism comprises a turnover plate, supporting rods, a first containing cabin and a driving device, wherein the turnover plate is hinged to the side edge of a deck of the ship body, the first containing cabin is arranged in a double-layer hull on the ship board portion of the ship body, the driving device is installed in the first containing cabin, one end of each supporting rod is supported by the turnover plate, the other end of each supporting rod is hinged to the first containing cabin, and the middle portion of each supporting rod is hinged to the driving end of the driving device. Each squat adjusting mechanism comprises a second containing cabin, an inflating and deflating device and an extensible air bag, wherein the second containing cabin is arranged in double-layer hull on the ship board portion of the ship body, the inflating and deflating device is installed in the second containing cabin, and the extensible air bag is communicated with the inflating and deflating port of the inflating and deflating device and can extend out of the ship body. The first containing cabins and the second containing cabins are arranged in a staggered mode.
Owner:WUHAN UNIV OF TECH

High-speed ice breaking vehicle by utilizing super magnetostrictive devices

The invention discloses a high-speed ice breaking vehicle by utilizing super magnetostrictive devices. The high-speed ice breaking vehicle comprises a chassis, a compartment, a cooling oil tank and a plurality of super magnetostrictive devices. The compartment is fixedly installed on an upper plane of the chassis, walking wheels are connected with a lower plane of the chassis, the cooling oil tank is installed in the compartment, and the super magnetostrictive devices are transversely installed in the compartment. Each super magnetostrictive device comprises an outer shell, an upper end cap and a lower end cap, wherein the upper end cap is arranged on the upper portion of the outer shell, the lower end cap is arranged on the lower portion of the outer shell, and a coil frame is arranged inside the outer shell. According to the high-speed ice breaking vehicle, the super magnetostrictive devices drive ice breaking nails to reciprocate at a high speed to knock and smash accumulated snow and ice blocks on the ground below the chassis and quickly clear away ice on a road; in addition, through the arrangement of the cooling oil tank, oiling and cooling on the super magnetostrictive devices can be achieved, the service life of the high-speed ice breaking vehicle is prolonged, large-thickness ice layers formed on the road of a cold region can be eliminated well, and normal passage of the city road is effectively guaranteed.
Owner:WEIFANG BAITE MAGNET TECH CO LTD

Buoyancy type self-cleaning flood gate for underground garage

The invention relates to the technical field of municipal equipment, and discloses a buoyancy type self-cleaning flood gate for an underground garage. The buoyancy type self-cleaning flood gate comprises a door frame, a floating gate body, a buoyancy cavity and a flood discharge cavity. The door frame is movably connected with the floating gate body, the floating gate body is arranged in the buoyancy cavity, and the buoyancy cavity communicates with the flood discharge cavity. According to the buoyancy type self-cleaning flood gate for the underground garage, when there is a light rain and water flow is relatively slow, the buoyancy cavity is a closed space, and a sediment accumulation phenomenon cannot occur. When there is a heavy rain, the floating gate body is triggered to stretch out to block water, one-time high-pressure water column cleaning can occur, so that less silt is accumulated at the bottom of the buoyancy cavity all the time, and it is ensured that the floating gate bodycan stretch out and draw back normally so as to guarantee normal passing of a vehicle. In addition, an inflation air bag carries out sealing protection on the top of the floating gate body, the siltand garbage are prevented from blocking the floating gate body, the force effect of the vehicle on the floating gate body is reduced, and location deformation of the floating gate body is reduced.
Owner:李育燕

Suspension bridge superstructure demolition and replacement installation method

The invention provides a suspension bridge superstructure demolition and replacement installation method. The suspension bridge superstructure demolition and replacement installation method comprises the following steps: a. erecting a trestle in parallel with a suspension bridge on the outer side of the suspension bridge, wherein the two ends of the trestle are connected with bridge approaches at the two ends of the corresponding suspension bridge; b. inspecting anchorages at the two ends of the suspension bridge and making sure that the anchorages are in a normal working state; c. demolishing original stiffening girders at an upper portion of the suspension bridge section by section; d. demolishing original suspenders and original cable clamps corresponding to the original stiffening girders; e. lifting a main cable through a crawler crane to realize the demolition of the original main cable at the upper portion of the suspension bridge; f. lifting a new main cable through the crawler crane to realize installation; g. installing new cable clamps and new suspenders at corresponding positions through surveying and setting-out; h. lifting each new stiffening girder section to a designated position by section through the crawler crane, and after all new stiffening girder sections are completely installed, connecting all sections to form an integral body. The suspension bridge superstructure demolition and replacement installation method shortens the demolition and replacement construction period of the suspension bridge superstructure to the utmost extent, and reduces the negative influence caused by the demolition and replacement of the suspension bridge superstructure.
Owner:CCCC ROAD & BRIDGE SPECIAL ENG

Road condition intelligent video monitoring method and system

The invention discloses a road condition intelligent video monitoring method and system, and the method comprises the steps: obtaining a road passing vehicle scene video, carrying out the recognition and analysis of the passing vehicle video based on a deep learning neural network, and carrying out the real-time analysis and collection of vehicle data; the method comprises the following steps: identifying scene videos of vehicles passing the road obtained at different places of the same road section, and determining and counting the ID number of vehicles passing the area within a fixed time interval to obtain vehicle flow and vehicle speed results; and deducing the road condition to a big data platform by using the obtained vehicle flow and vehicle speed results, and carrying out early warning decision making. According to the road condition intelligent video monitoring method and system, real-time intelligent video monitoring is carried out on the road condition through the deep learning neural network, the traffic condition, behaviors and personnel violating the safety specification are found in time, an alarm is automatically sent and uploaded to the rear-end traffic platform, the rear-end traffic platform notifies related workers to immediately process, and the road traffic safety is ensured.
Owner:深圳英飞拓仁用信息有限公司

Urban bridge rapid demolition and reconstruction construction method based on gantry crane

PendingCN113863172AMeet the needs of rapid transformationSatisfy navigational restrictionsBuilding repairsBridge erection/assemblyBridge engineeringArchitectural engineering
The invention discloses an urban bridge rapid demolition and reconstruction construction method based on a gantry crane, and belongs to the field of bridge engineering. The method comprises the steps that S1, an auxiliary road bridge is constructed, and traffic is guided and changed to the auxiliary road bridge; S2, a main bridge gantry crane is erected; S3, a bridge dismantling bracket is erected; S4, an arch rib support is erected; S5, an accessory structure and a bridge deck system of the old bridge are detached; S6, a rope saw is adopted for cutting the bridge flange plate and hoisting away the bridge flange plate; S7, after the suspender is dismantled, the suspender is transported out of the construction site; S8, arch ribs are cut and hoisted away in a segmented mode through a gantry crane; S9, the main beam is cut, decomposed and hoisted away in a segmented mode through a gantry crane; and S10, the old pier platform steel sheet pile cofferdam is constructed and decomposition and hoisting are performed on a lower structure; according to the rapid dismantling and reconstruction method, ecological dismantling of an old bridge and rapid erection of a new bridge are achieved through repeated utilization of the bridge dismantling gantry crane, the requirements of navigation limitation and environmental protection are met, and normal traffic of urban trunk traffic is guaranteed.
Owner:中铁二十二局集团第三工程有限公司 +1

Construction method for making prestressed back for box-culvert jacking

The invention discloses a construction method for making a prestressed back for box-culvert jacking. The construction method is characterized by comprising the steps as follows: preparing the prestressed back according to the maximum jacking force required for box-culvert jacking on one side of a sliding plate; burying a plurality of prestressed steel strands in the prestressed back and the sliding plate; stressing the prestressed steel strands to form a whole structure; prefabricating a box culvert on the sliding plate; and jacking the box culvert through a jack. According to the construction method, under the circumstance that a natural back is inexistent or the natural back cannot provide an enough box-culvert jacking force, the prestressed back is fabricated to provide the jacking force required for box-culvert jacking so as to finish the box-culvert jacking construction; the ground damage degree is small, the traffic is not influenced, the vehicles on the ground are guaranteed to run smoothly, and the traffic pressure is relieved; and noise and environmental pollution cannot be caused in the construction process, less construction equipment is used, the construction method is simple, economic and reasonable, the jacking construction can be carried out in winter without weather influence, the jacking distance is longer, and the construction safety is high.
Owner:SHENYANG MUNICIPAL GROUP +1

Highway and railway dual-purpose vehicle capable of fast getting up and down lanes

PendingCN109130736AOvercome the inconvenience of getting on and off the roadGuaranteed normal passageRail and road vehiclesHydraulic cylinderVehicle frame
The invention discloses a highway and railway dual-purpose vehicle capable of fast getting up and down lanes. The cab of the vehicle is located on the top surface of the frame, the powertrain is mounted on the frame and drives the vehicle through the control of the cab, a hydraulic suspension wheel is arranged on the bottom surface of the vehicle frame and drives the vehicle frame to be lifted andlowered through a hydraulic cylinder, a hydraulic suspension wheel drives the wheel to rotate by a driving motor, a steel wheel set is provided with a driving motor and is arranged on the bottom surface of the vehicle frame, a cargo box is arranged on the top surface of the vehicle frame, a hydraulic leg assembly is arranged on the bottom surface of the vehicle frame at intervals, and left-righttranslation of the vehicle frame is realized by vertical lifting and lowering of the legs and expansion and contraction of the legs on the same side. The invention overcomes the shortcomings of the inconvenience of the traditional traction rail car, effectively improves the construction operation efficiency, reduces the construction and equipment cost, reduces the equipment investment, and ensuresthe normal passage of the rail car.
Owner:SHANGHAI BAOYE GRP CORP

Construction method for erecting prefabricated box girders through walking type bridge girder erection machine

The invention relates to the field of bridge construction, in particular to a construction method for erecting prefabricated box girders through a walking type bridge girder erection machine. The method includes the steps that the prefabricated box girders transported through a girder transporting vehicle are lifted at the rear end of the bridge girder erection machine; components such as front and rear supporting legs and middle and rear carrying wheels of the bridge girder erection machine are adjusted; the bridge girder erection machine is pushed to move forwards when the weight of the bridge girder erection machine is kept balanced; the front supporting legs of the bridge girder erection machine are moved to a pier cover beam to be erected and stridden at the front position, the rear supporting legs support the top faces of the font ends of the erected box girders, and therefore a hole passing purpose is achieved; and then a girder transporting crane on the bridge girder erection machine is used for lifting the box girders. By the adoption of the construction method, the defects that a crane needs to be repeatedly erected and moved, the construction efficiency is low, and the risk coefficient is high are overcome. A construction period can be guaranteed, normal construction and vehicle passage of a road under a bridge are guaranteed as well, meanwhile, the construction cost is reduced, the safety coefficient is high, social benefits and economic benefits are good, the method is suitable for being applied to urban prefabricated box girder lifting projects and particularly suitable for lifting of the relatively high prefabricated box girders of the bridge over water.
Owner:JINAN URBAN CONSTR GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products