Support and anti-seepage structure of tunnel high-pressure water-rich solution cavity section and construction method
A construction method and technology of waterproof structure, applied in the direction of tunnel, tunnel lining, earthwork drilling and mining, etc., can solve the problems of damage, the curtain grouting structure cannot resist the water pressure of the solution cavity, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:
[0023] combine figure 1 — image 3 As shown, an anti-seepage structure for the support of the high-pressure water-rich dissolved cavity section of the tunnel is mainly composed of a double-layer primary support, a first-layer waterproof structure, and a double-layer secondary lining arranged sequentially in the inner circumferential direction of the high-pressure water-rich dissolved cavity section A. And the anti-permeability isolation section B arranged at both ends of the high-pressure water-rich dissolution chamber section A.
[0024] Such as figure 2 As shown, the double primary support consists of the first layer of primary support 1 and the second layer of primary support 2. Both the primary support 1 of the first layer and the primary support 2 of the second layer adopt a circular ring structure of shotcrete shotcrete with a full-ring steel ar...
PUM