A stepped ecological slope protection structure and its implementation method in the water-fluctuation zone of the reservoir area
A technology for ecological slope protection and implementation methods, applied in botany equipment and methods, coastline protection, horticulture, etc., can solve the problems of difficult attachment of plant growth substrates, difficult growth of plants, and easy erosion of growth substrates by waves. Fewer materials, reduced destructive power, and reduced cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] A step-shaped ecological slope protection structure in the ebb and flow zone of a reservoir area, characterized in that:
[0035] Several horizontal steps 2 poured with concrete are arranged on the slope on the fluctuation belt. Between adjacent horizontal steps 2 is a first-level slope 1 . The vertical height difference between the adjacent two levels of horizontal steps 2 is 2-3 meters, and the width of the horizontal steps 2 (the depth from far from the slope to the close to the slope) is 0.7-1.0 meters.
[0036] A reinforced concrete tension beam 5 is arranged at the lower end of each level of slope 1 . The bottom of the reinforced concrete tension beam 5 is in contact with the horizontal step 2 . The reinforced concrete tension beam 5 has several anchor holes for the anchor rods 6 to pass through. By inserting the anchor hole and driving the anchor rod 6 inside the slope 1, the reinforced concrete tension beam 5 is fixed.
[0037] A plurality of plant-type poro...
Embodiment 2
[0042] This embodiment is directed to the implementation method of the step-shaped ecological slope protection structure in the ebb and flow zone of the reservoir area described in Embodiment 1, and is characterized in that, it includes the following steps:
[0043] S1: Fluctuation zone slope cleaning: To clean up the broken rock and soil mass on the slope surface of the fluctuation zone in the reservoir area.
[0044] S2: Prefabricated several sections of concrete beams, each section is 5 meters long. Prefabricated plant-type porous concrete prefabricated module 3. The section of the concrete beam is rectangular, the height is 0.2-0.25m, and the width is 0.2-0.25m.
[0045] S3: Construction of horizontal steps 2: Build a horizontal step 2 at a certain height on the rock and soil slope, and slope 1 is between adjacent horizontal steps. The horizontal steps 2 are formed by pouring cement on the geotechnical slope.
[0046] S4: Construction of concrete anchor rod tension beam...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com