A night-time pile point positioning construction method
A construction method and pile point technology, which is applied in the field of pile point setting, can solve the problems that the pile point is easy to deviate, difficult to quickly find, CFG pile foundation installation dislocation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] see figure 1 Shown, night pile point location setting method of the present invention comprises the following steps:
[0018] a. Select several laser lamps 1, the number of laser lamps 1 is determined according to the number of CFG piles 2 to be laid. In order to ensure the safety of the construction workers, the light beam emitted by the selected laser light 1 is safe to the human body and will not cause harm to the human body. At the same time, the laser light must be operated safely, and it is strictly forbidden to irradiate the eyes or prevent the eyes from being irradiated. Since red light and green light intersect to produce yellow light, several laser lamps 1 selected in the present invention emit red light, and several emit green light.
[0019] b. On the construction site, determine the location of the layout area of the CFG pile foundation 2 according to the construction design drawings.
[0020] c. According to the regional position of the CFG pile founda...