A kind of road area water warning road shoulder
A road shoulder and area technology, which is applied in the field of warning road shoulders and road area water warning road shoulders, can solve the problems of inconvenient use of warning, high energy consumption cost of lighting operation, and inability to adapt to changes in real time, so as to achieve the effect of improving height
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] A road area water warning shoulder of the present invention is realized in the following way: a road area water warning road shoulder of the present invention is composed of a road shoulder main body (1), a warning ball (2), a through hole (3), a filter screen (4), a water inlet Hole (5), sliding rod (6), buoyancy chamber (7), No. 1 floating ball (8), sliding cylinder (9), No. 2 floating ball (10) and water inlet chamber (11), main body of road shoulder (1) There is a water inlet chamber (11) inside, and the water inlet chamber (11) runs through one side of the road shoulder main body (1). The top of the road shoulder main body (1) is equidistantly opened with a plurality of through holes (3), the through holes (3) communicate with the water inlet chamber (11), and the through holes (3) are divided into upper and lower two. section, the diameter of the upper section of the through hole (3) is smaller than the diameter of the lower section, the length of the upper sectio...
Embodiment 2
[0022] The difference between this embodiment and Embodiment 1 is: a water tank (12) is added at the bottom of the road shoulder main body (1), and the water tank (12) is connected to the water inlet chamber (11); when in use, the water tank (12) It is connected with the municipal drainage channel and cooperates with the drainage work;
[0023] The mouth of the water inlet chamber (11) is equipped with a filter screen (4), which can filter the rainwater entering the water inlet chamber (11) to prevent debris from entering and blocking the water inlet chamber (11); The hole (3) is divided into upper and lower sections. The diameter of the upper section of the through hole (3) is designed to be smaller than the diameter of the lower section. The upper and lower sections of the through hole (3) cooperate to limit the No. 2 floating ball (10). The No. 2 floating ball (10) carries out the jacking of the first stage;
[0024] The length of the upper section of the through hole (3) ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 