On-arch active control leveling anchoring device assembly for suspender replacement and method for suspender replacement
A technology of active control and anchoring device, applied in arch bridges, bridge reinforcement, erection/assembly of bridges, etc., can solve the problems of slow progress of demolition and restoration operations, inability to timely feedback control, and inability to use pads in turnaround, and achieve timely online monitoring. The effect of feedback control, easy control of construction quality, easy replacement and installation and dismantling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] An on-arch active control leveling anchor assembly for boom replacement.
[0052] Such as Figure 1-Figure 3 As shown, the active control leveling anchor device assembly on the arch used for boom replacement includes two sets of active control leveling anchor devices on the arch, and the two sets of active control leveling anchor devices on the arch are respectively arranged on one side of the old boom. The active control leveling and anchoring device on the arch includes: leveling beam 4, pin joint structure I5, inclination sensor 6, pin joint structure II7, force sensor I8, electric cylinder I9, pin joint structure III10, upper clamp I11, upper clamp Ⅱ12, pin connection structure Ⅳ13, pin connection structure Ⅴ14, 2 upper high-strength screws 15, force sensor Ⅱ16, 2 electric cylinders Ⅱ17, force sensor Ⅲ18, 2 electric cylinders Ⅲ19, lower fixture Ⅰ20, pin connection structure Ⅵ21, lower fixture II22, pin connection structure VII23, two lower high-strength screws 24 a...
Embodiment 2
[0060] A method for replacing the suspender of a concrete arch bridge:
[0061] It is a method for replacing the suspension rod of a concrete arch bridge by using the active control leveling anchor assembly on the arch described in the first embodiment for the replacement of the suspension rod, and it includes the following steps:
[0062] A. Install the active control leveling anchor assembly on the arch for boom replacement:
[0063] Install a set of active control leveling and anchoring devices on the arch symmetrically on both sides of the old suspenders of the main arch ring;
[0064] B. Install the upper and lower pole beams, tension jacks and temporary booms:
[0065] Vertically set the upper pole beam 3 on the leveling beam 4 of the active control leveling anchor device on the arch, and the four temporary suspenders 28 pass through the tension jack 2, the upper pole beam 3, and the lower pole beam respectively from top to bottom. 30, the upper end is anchored by the ...