An auxiliary pipeline connection fixing fixture for pipeline construction

A technology for auxiliary pipeline and pipeline construction

Active Publication Date: 2021-10-19
衡阳市兴达市政工程有限公司
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Pipeline transportation is not only large in volume, continuous, fast, economical, safe, reliable, stable, less investment, less land occupation, and low cost, but also can realize automatic control, especially for long-distance transportation of oil or natural gas, which is more convenient. However, due to the complex geographical location of our country, in order to shorten the transportation distance when encountering cliffs or large drops during transportation, it is necessary to build vertical metal pipelines. Due to limitations and geographical conditions, it is necessary to weld the pipeline vertically. Sequential vertical connection of multiple pipes
[0003] However, the existing metal pipelines have the following problems in the vertical connection process: a. In the vertical connection operation of traditional building metal pipelines, it is necessary to manually connect the metal pipelines to a high place with the help of climbing tools. There are potential safety hazards in the butt joint of metal pipes. The height of the joint position in the continuous vertical butt joint operation continues to increase, and the operator has to change the position accordingly, which is very dangerous.
b. The proportion of metal pipes in buildings is relatively large. Manually controlling the connection of metal pipes requires a lot of physical strength to control the position of metal pipes. Manual work cannot guarantee the accuracy of the connection position of metal pipes, and cannot control the connection of metal pipes during the docking operation. Precise adjustment that affects the quality of metal pipe butt joints

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An auxiliary pipeline connection fixing fixture for pipeline construction
  • An auxiliary pipeline connection fixing fixture for pipeline construction
  • An auxiliary pipeline connection fixing fixture for pipeline construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.

[0028] Such as Figure 1 to Figure 6 As shown, an auxiliary pipeline connection fixing fixture for pipeline construction includes a fixed support frame 1, a fixing mechanism 2 is installed on the outer wall of the fixed support frame 1, a feed mechanism 3 is installed inside the fixed support frame 1, and a feed mechanism 3 is installed on the feed mechanism 3. There is a holding mechanism4.

[0029] The fixing mechanism 2 includes a sliding adjustment branch chain 21 installed on the front side of the fixed support frame 1, the sliding adjustment branch chain 21 is evenly provided with locking parts 22, and the rear side of the locking part 22 is connected to the locking branch chain 23 , the locking branch chain 23 is installed on the fixed suppo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an auxiliary pipeline connection fixing fixture for pipeline construction, which includes a fixed support frame, a fixing mechanism is installed on the outer wall of the fixed support frame, a feeding mechanism is installed inside the fixed support frame, and a clamping mechanism is installed on the feeding mechanism. The present invention can solve the following problems in the vertical connection process of the existing metal pipes; a. In the vertical connection operation of the traditional building metal pipes, it is necessary to manually connect the metal pipes to a high place with the help of climbing tools. There are potential safety hazards in the butt jointing of metal pipes controlled at heights. The height of the joint position in the continuous vertical butt joint operation continues to increase, and the operators have to change positions accordingly, and the work is very dangerous. b. The proportion of building metal pipes is relatively large. Manually controlling the connection of metal pipes requires a lot of physical strength to control the position of metal pipes. Manual work cannot guarantee the accuracy of the connection position of metal pipes.

Description

technical field [0001] The invention relates to the technical field of pipeline connection equipment, in particular to an auxiliary pipeline connection fixing fixture for pipeline construction. Background technique [0002] Pipeline transportation is not only large in volume, continuous, fast, economical, safe, reliable, stable, less investment, less land occupation, and low cost, but also can realize automatic control, especially for long-distance transportation of oil or natural gas, which is more convenient. However, due to the complex geographical location of our country, in order to shorten the transportation distance when encountering cliffs or large drops during transportation, it is necessary to build vertical metal pipelines. Due to limitations and geographical conditions, it is necessary to weld the pipeline vertically. Sequential vertical connection of multiple pipes. [0003] However, the existing metal pipelines have the following problems in the vertical conne...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): B23K37/053B23K101/06
CPCB23K37/0533B23K2101/06
Inventor 潘雪军程业春
Owner 衡阳市兴达市政工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products