Construction method of drilling device for complex high and steep side slope
A drilling device and technology for high and steep slopes, applied in the field of geotechnical engineering, can solve problems such as hole position deviation, drill pipe breakage, and poor stability, and achieve enhanced stability and safety performance, high work efficiency, and stable structure Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0041] Example 1
[0042] Such as Figure 1-5As shown, a construction method of a drilling device of a complex and high and steep slope includes a drill bracket 1, a drill base 12, and a drilling machine 2; the drilling machine holder 1 includes a skateboard 3, The chassis 4 and the platform 5 are provided on the slide 3; the chassis 4 includes two chassis longitudinal steel pipes 401 parallel to the slider, and the chassis crossing steel pipe 402, the chassis, the bottom tray 403, by the chassis The steel pipe 401 slides to achieve the opening and closing of the chassis cross-steel pipe 402, and the longitudinal steel pipe 401 is fixed to the slide 3, the platform 5 includes two longitudinal steel pipe 501 parallel to the skateboard 3, which is sleeve to the platform longitudinal steel pipe 501 platform Cross cross steel pipe 502 and front, after two telescopic beams 504, the platform sleeve 503 slide through the longitudinal steel pipe 501 along the platform to achieve the openin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap