Desilting method for prefabricated pump station
A technology for pumping stations and water pumps, applied in the direction of separation methods, chemical instruments and methods, fixed filter element filters, etc., can solve the problems of easy accumulation of silt and water, affecting the efficiency of pumps, the safety of pumping stations, and normal maintenance hazards and other problems to achieve the effect of avoiding blockage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
[0038] See attached Figure 1-8 Shown, a kind of dredging method of prefabricated pumping station, its manufacturing process specifically comprises the following steps:
[0039] S1. Pump station installation: the bottom of the water pump is fixed to the base 1, and the bottom surface of the water pump is in the form of sinking;
[0040] S2. Preparation for dredging: the feed structure 4 drives its pillar 43 to be located directly below the drain hole 38, and the solid drain hole 22 and the d...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


