A test method based on the train control system of vehicle-to-vehicle communication
A train control system and vehicle-to-vehicle communication technology, which is applied in the field of test runs based on train-to-vehicle communication train control systems, can solve problems such as poor compatibility of train control systems, and achieve the effect of ensuring the safety of test runs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] This method can be used for fixed occlusion systems, quasi-mobile occlusion systems, mobile occlusion systems, and signal systems of various modes such as CBTC system, CTCS system, ETCS system, PTC system, ITCS system and TACS system, so the rights of this method and system are The requirements also apply to these and similar systems.
[0046] like figure 1 The shown test line system structure diagram of the TACS system includes a depot and a test section; the vehicle depot includes a depot trackside resource manager; the test section includes a test section trackside resource manager and a trackside train manager , target controller, test line workstation; the depot trackside resource manager is connected with the test depot trackside resource manager; the test line workstation is respectively connected with the test depot trackside resource manager and the trackside train manager; The trackside resource manager of the test depot is connected with the target controlle...
Embodiment 2
[0078] like image 3 As shown, the non-automatic commissioning process of the test line includes the following steps:
[0079] Step 1: The operator on duty at the test line informs the operator on duty at the depot by phone that a test drive is required;
[0080] Step 2: Under the condition that the test line section is idle, the test line attendant issues the operation task for the test train to enter the test line, the test line trackside resource manager applies for the test train to enter the test line resource, and the depot is scheduled in the resource. After the allocation, the driver is notified to enter the test line, and the driver drives the car to the test line in manual mode;
[0081] Step 3: For the communication test train in the TACS mode, according to the operation task issued by the ATS, the mobile authorization is calculated autonomously, and the test task is completed under the protection of the mobile authorization;
[0082] Step 4: For the non-communica...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com