Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for processing interphase short circuit of three-phase non-effective grounding power supply system

A non-effective grounding and power supply system technology, applied in short-circuit testing, emergency protection circuit devices, electrical components, etc., can solve problems such as large power grid impact, line damage, and long time-consuming processing of faults

Active Publication Date: 2021-11-30
BAODING YUXIN ELECTRICAL TECH
View PDF6 Cites 26 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

2. Adopt the time-level difference coordination method: that is, the same line circuit breaker sets different over-current tripping times according to the distance from the power supply. The closer the distance to the power supply, the longer the tripping time. Generally, the setting level difference is 100ms. This time is determined by the mechanical switch. The action duration is determined by the time spent on the algorithm. This method can isolate the fault area. However, for faults where the fault point is close to the power supply, the power supply system can withstand short-circuit current for a long time and have a large impact on the power grid.
However, during this operation, the uncut circuit breaker and the power supply system are continuously subjected to a large short-circuit current impact. If the time is too long or the number of times is too high, the circuit will be damaged.
If the duration of the phase-to-phase short circuit cannot exceed 300 milliseconds, and the circuit breaker trip time is 100 milliseconds, then generally there should not be more than three circuit breakers on the line, otherwise the above method may cause the line to exceed 300 milliseconds.
It can be seen that the existing interphase short circuit processing methods all have the disadvantages of taking a long time to deal with the fault and not being able to automatically eliminate the fault

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for processing interphase short circuit of three-phase non-effective grounding power supply system
  • Method for processing interphase short circuit of three-phase non-effective grounding power supply system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Below in conjunction with accompanying drawing, the present invention will be further described by specific embodiment:

[0025] The three-phase power supply system is a common non-effective grounding system. Generally, there are multiple outgoing lines on the busbar of the three-phase power supply system, and multiple controlled switches are set on each outgoing line. The controlled switches can detect one-phase, two-phase It can be set to cut off the three-phase line when the number of current pulses passing through any phase reaches the preset value. In a specific embodiment about the controlled switch, the controlled switch includes a control unit, a current detection unit and an execution unit, the current detection unit can respectively detect the current of each phase of the three-phase line, and the control unit will detect the current detected by the current detection unit The number of pulses is compared with the preset value, and it can be set that when the n...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for processing interphase short circuit of a three-phase non-effective grounding power supply system. The method comprises the following steps: when two-phase or three-phase interphase short circuit occurs in a line, maintaining one fault phase of the line to be conducted and tripping off other fault phases, and artificially grounding the other fault phase conducted with the fault phase or directly utilizing the existing grounding point; enabling a live-line phase or a neutral point of the three-phase non-effectively grounded power supply system except the fault phase to be circularly connected and disconnected with the ground, so that the live-line phase or the neutral point and the fault phase form a closed loop and generate a current pulse, and detecting the current pulse by a controlled switch; when a certain controlled switch reaches a trigger condition and cuts off a line, eliminating a fault. According to the method, the inter-phase short-circuit fault point interval can be quickly positioned, the fault can be automatically, quickly and accurately removed, the processing quality of the inter-phase short-circuit fault can be well improved, and the power supply safety is improved.

Description

technical field [0001] The invention relates to the field of fault processing of power supply systems, in particular to a processing method for phase-to-phase short-circuit faults in a three-phase non-effectively grounded power supply system. Background technique [0002] At present, when a phase-to-phase short circuit occurs in a line of a three-phase non-effectively grounded power supply system, the usual method is: 1. Use the reclosing method: first cut off the first circuit breaker on the line and then close the first breaker If it is an instantaneous phase-to-phase short circuit and it is eliminated after closing the first circuit breaker, the normal power supply will continue. If the phase-to-phase short-circuit fault still exists after closing the first circuit breaker, cut off the first circuit breaker and wait for maintenance. 2. Adopt the time-level difference coordination method: that is, the same line circuit breaker sets different over-current tripping times ac...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02H7/26G01R31/52
CPCH02H7/26G01R31/52H02H1/0007H02H3/033H02H7/262H02H7/30
Inventor 薛占钰邢进春
Owner BAODING YUXIN ELECTRICAL TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products