Novel aluminum alloy external window hole cleaning installation construction method
A construction method and technology of aluminum alloy, applied in the direction of frame fixing, joint tightening/covering, etc., can solve the problem that aluminum alloy outer window is easy to fall off, reduce the service life of aluminum alloy outer window, and crack the aluminum alloy outer window, etc. problems, to achieve the effect of being conducive to the control of construction quality, flexible construction methods, and preventing cracking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] Embodiment 1: a new type of aluminum alloy exterior window clear opening installation and construction method, comprising the following steps:
[0029] (1) First observe the opening of the outer window, and measure the size of the opening to see if the height and width of the opening are roughly the same as the height and width of the outer window. The height and width of the window are roughly the same as the height and width of the outer window, and the height and width of the construction of the opening and the height and width of the outer window frame ensure that the error is within 0.5 cm;
[0030] (2) After the construction of the hole is completed, the hole should be plastered and cleaned to ensure the sanitation of the hole. The cleaning of the hole can be cleaned with a cleaning brush and cleaning fluid, so as to facilitate the inspection of the hole in the subsequent sequence;
[0031] (3) After the opening of the hole is cleaned, the horizontality and vertic...
Embodiment 2
[0035] Embodiment 2: a new type of aluminum alloy exterior window clear opening installation and construction method, comprising the following steps:
[0036] (1) First observe the opening of the outer window, and measure the size of the opening to see if the height and width of the opening are roughly the same as the height and width of the outer window. The height and width of the window are roughly the same as the height and width of the outer window, and the height and width of the construction of the opening and the height and width of the outer window frame ensure that the error is within 0.5 cm;
[0037] (2) After the construction of the hole is completed, the hole should be plastered and cleaned to ensure the sanitation of the hole. The cleaning of the hole can be cleaned with a cleaning brush and cleaning fluid, so as to facilitate the inspection of the hole in the subsequent sequence;
[0038] (3) After the opening of the hole is cleaned, the horizontality and vertic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com